Caribbean Contesting Consortium

Work Plans

ccc_small1.gif (6461 bytes) thumb1.jpg (8584 bytes) Return to Home Page

| December 31 2000 - January 22 2001 | February 12 - 20 2001 | September 20 - October 2 2001 | February 11 - 26 2002 | March 14 - April 2 2002 | September 2002 | November 2002 | January 2003 | February 2003 | March 2003 | July 2003 | September 2003 | November 2003 | February 2004 | July 2004 | September 2004 | October 2004 | January - April 2005 | September 2005 | October 2005 | February - April 2006 | June - July 2006 | September 2006 | November - December 2006 | February - April 2007 | July 2007 | September 2007 | February/March 2008 | July 2008 | September 2008 | November - December 2008 | January - April 2009 | July 2009 | October 2009 | November - December 2009 | January - April 2010 | September 2010 | October - November 2010 | December 2010 | January - April 2011 | October 2011 | February - April 2012 | November - December 2012 | January - April 2013 | September 2013 | November - December 2013 | January - April 2014 | October 2014 | November - December 2015 | January - April 2015 | October 2015 | November - December 2015 | February 2016 | October 2016 | November - December 2016 | January - April 2017 | November - December 2017 | January - March 2018 | October - December 2018 | January - March 2019 | October-December 2019 | January - March 2020 | COVID YEAR | February - April 2021 | October - December 2021 | January - April 2022 | October - December 2022 | October - December 2024 |

Black = Item Is Needed
Grey = Item Has Been Obtained or Accomplished

 

 

October - December 2024

Project Need to Take On Hand or Buy Locally
Isolate problem and parts needs for HF-2500 3CPX800A7 tubes (2)  
Initiate repaint of Europe tower   Grey epoxy
Isolate problem and parts needs for Titan III    
Dig out most plants behind West Bedroom, Roundup, and seal with membrane Membrane or geotextile
Install new soffits on north side of house
Replace rotor in Europe tower   Tailtwister repaired by Carl's
Replace rotor in WARC tower   Ham IV on site with wire connections
Repair 160 meter Inv L TX antenna
160 meter radial assessment and restoration Wire tracer from W8WTS  
Institutionalize RTTY at two stations using WI9WI directions    
     
Set up FT-8 at Stations 1 and 2    
Continue the procedure for permanent installation of the generator Cables and connectors  
Install ASUS MODEM and PC up on wall between EBR beds with surface mount conduit Brackets (bottom dresser drawer, EBR)
Retrieve and patch yellow radial above fiber conduit    
     
     
     
     
     

January - April 2024

Project Need to Take On Hand or Buy Locally
Isolate problem and parts needs for HF-2500 3CPX800A7 tubes (2)  
Repair 160 Inv L Unun  
Isolate problem and parts needs for Titan III    
Dig out most plants behind West Bedroom, Roundup, and seal with membrane Membrane or geotextile
Install new soffits on north side of house
Spot fix all security bar rust and epoxy twice and cover with Comotex
160 meter radial assessment and restoration Wire tracer from W8WTS  
Institutionalize RTTY at two stations using WI9WI directions    
Try to reduce SWR in remote filter panel on 40 and 20 RG-8/X crimp connectors from W8WTS  
Overtape bad areas of tape with Eternabond Eternabond roof tape  
Fix AL-1200 (6) T/R board    
Install ASUS MODEM and PC up on wall between EBR beds with surface mount conduit Brackets (bottom dresser drawer, EBR)
Continue maintenance of US/JA tower    
Replace failing Big Grip on US tower, middle, wall   Big grip and stainless steel thimble
Replace failed conduit brackets in Ocean Pavilion ceiling    
Aggressive clean of Ocean Pavilion inside ceiling to slow down deterioration    
Install concrete caulk on Step Closet stairs    
Replace west side of Ridge tribander 20 meter driven element DXE selected sizes of tubing via Bennetts
Replace ESR east light fixture with a motion sensor Singled system   Singled motion sensor spot on site; Metal work box
Triage Europe tower and apply needed paint    
Replace sofa and loveseat in East Sunroom    
Plant new trees in irrigation places in front yard Trees from Dijtham
Test and/or toss ESR HP 3 in 1 and PC speaker system    
Install Asus RT-3000X router RT-3000X router via Amazon and Ohio  
Retrieve and patch yellow radial above fiber conduit    
Remove or secure KPA-500    
Troubleshoot or replace remote station Foscam New Foscam  
Stop severe water leak in laundry room in hot supply side   15 mm tubing and fittings
Replace failed light fixture for Singled bulbs at house northwest corner Bell double lampholder and work box  
Test N0NR 3CPX800A7 tubes, season, then store Tubes  


October - December 2023

Project Need to Take On Hand or Buy Locally
Install second uSwitch (replaced version)    
Repair 160 Inv L    
Add ground power to irrigation controller Rechargeable batteries, trickle charger, and power cabling  
Install remote station filter panel bypass system On hand A/B switch and on hand cables and connectors  
Isolate problem and parts needs for Titan III    
Troubleshoot WARC Ring camera; install new if necessary New Ring camera  
Re-install KPA-1500
Dig out most plants behind West Bedroom, Roundup, and seal with membrane Membrane or geotextile
Install new soffits on north side of house
160 meter radial assessment and restoration    
Replace remote station K3 if available    
Institutionalize RTTY at two stations using WI9WI directions    
Install remote station's bandpass filter panel if available Bandpass filter panel built from N7IR-provided components  
Emphasis for K5PI: keys; fuse panel; furniture security; replacement of propane bottle; management of security system; buildup and then teardown/storage of equipment; contact to Zoom, Brett, Dirk; IP architecture; RX antenna architecture; periodic maint of Beverages; tower cleanup and re-paint protocol; Kooyman; Antillianse Verfabriek; feedline routes and connections; paint protection of Europe tower while climbing; front gate technique;    
Caulk Step Closet steps   5 tubes Dap concrete caulk 
Initiate varnishing of pavilion ceiling    
Caulk all gaps in East Sunroom sliding glass doors   4 tubes caulk
Continue maintenance of US/JA tower    
Triage Europe tower and apply needed work    
Replace sofa and loveseat in East Sunroom    
Season, test, label, inventory, then store new 3CX1200A7 (in ESR bottom drawer)    
Retrieve and patch yellow radial above fiber conduit    
Troubleshoot AL-1200 (3) will not tune    
Replace/eliminate 160 Inv L unun    
Install remote filter panel bypass system coax isolation relay at K3 Additional +12 VDC coax relay box; attach to K3 ANT connector  


January - April 2023

Project Need to Take On Hand or Buy Locally
Install second uSwitch so that we can have redundant on and off control uSwitch and CAT6 cable  
Reconfigure remote for RRC boxes Ethernet CAT6 cable and Gene's instructions  
Study possibility of adding ground power to irrigation controller    
Isolate problem and parts needs for Titan III    
Add additional hard cladding to fiber up utility pole   Metal conduit and pipe straps
Get bucket truck out to trim tree branches on Eur Stone guys
Dig out most plants behind West Bedroom, Roundup, and seal with membrane Membrane or geotextile
Install new soffits on north side of house
160 meter radial assessment and restoration    
Pick up Rohn 55 sections and mow    
Institutionalize RTTY at two stations    
Replace US/JA guy grips as needed   Big grips
Touch up rust blooms on Ridge tower    
Capture and store all Sercomm setup screens with new RRC forwarding    
Varnish front gate    
     
Add a motion sensing LED light outside wall along walkway Round work box and bulb socket Singled LED motion sensor bulb
Rehab down ropes on US/JA 2 el and replace feedline 100 ft RG-8X  
Retrieve and patch yellow radial above fiber conduit    
Repair shack airco vanes motion    
Clear trees from 80 Eur wires    
Install new fans in Astrons from Stn 1, Stn 2 Six fans bought on Amazon and Torx 10 bit  


October - December 2022

Project Need to Take On Hand or Buy Locally
Complete corrosion control on US/JA tower   Epoxy grey
Label, stow, and inventory new VE4GV rotors Rotor from Trares and one from Idaho  
Study possibility of adding ground power to irrigation controller    
Isolate problem and parts needs for Titan III    
Add additional hard cladding to fiber up utility pole   Metal conduit and pipe straps
Routine maintenance - Europe Beverage
Routine maintenance - US/JA Ridge Beverage
Add additional mechanical sheathing and anchoring at top of rock cliff
160 meter radial assessment and restoration    
Relocate remote station to new location Very long list Shelf material
Activate remote station with three hard cabled antennas to beta users    
Install and test 18 antenna through relays Fabricated relay boxes  
Install 1 x 18 box, relay module, and all cabling   Coax for jumpers
Connect the 18 relays a few at a time    
Institutionalize RTTY at two stations    
Replace US/JA tower side ocean guy grip and assess all others   Big grip
Touch up rust blooms on Ridge tower    
Capture and store all Sercomm setup screens    
Install 1 GB IP switch on deskback   1 GB IP switch
Stash new Richmond water heater Richmond 20 gallon water heater via ocean freight  
Install two new Ring camera batteries (East Porch, West Porch) Batteries  
Repair AL-1200 (3) from Station 1   Electrolytics (8 screw terminal)
Add a motion sensing LED light outside wall along walkway Round work box and bulb socket Singled LED motion sensor bulb
Repair broken reflector wire on Europe 80 and trim tree branches    
Install KPA-1500 at remote station    
Retrieve and patch yellow radial above fiber conduit    
Replace T/R relay in AL-1200 (1)   Use spare Deltron from NJY box
Clear trees from 80 Eur wires    
Install new fans in Astrons from Stn 1, Stn 2 Six fans bought on Amazon and Torx 10 bit  
Add 160 feet to Europe Beverage and move termination and ground    
Add usage directions with glue on every K3 (N7IR) On clipboard  

January - April 2022

Project Need to Take On Hand or Buy Locally
Install new blinds in East Sunroom Blinds in shipping box as it arrived at Trares - ocean freight  
Place HF-2500 amplifier into trial service at Station 1 Commander amp and tube/transformer boxes  
Label, stow, and inventory new rotors Rotors from Trares and Idaho  
Label, stow, and inventory new Autek WM-1 (2 each) Autek WM-1  
Study possibility of adding ground power to irrigation controller    
Get Foscams online on new Huawei MODEM   New camera on hand, brought by K8ND
Isolate problem and parts needs for Titan III    
Reinstall stop and retention bracket on front gate 3 each 5: x 3/8 concrete anchors  
Install new bedspread in East Sunroom   Light off-white spread
Thin out Shovic pile
Restore Foscams to new modem or to ASUS    
Make permanent repair of irrigation line under sidewalk and install new landscape border   27 foot x 20 cm landscape border
Begin painting sections on Europe tower    
Routine maintenance - Europe Beverage
Routine maintenance - US/JA Ridge Beverage
Install kick plate inside West Bathroom door Kick plate - D has dimensions  
Construct DC control board for W9NJY box, Ridge portion, and have it ready for install. See photos about Oct 20 2021.    
Tune 80 meter three element correctly    
US/JA tower ongoing corrosion control    
160 meter radial assessment and restoration    
Institutionalize RTTY at two stations    
Grip bar in West bathroom KB7Q grip bar  
Install manual alternative to 80 3el driven element loop switch    

October - December 2021

Project Need to Take On Hand or Buy Locally
Install new blinds in East Sunroom Blinds in shipping box as it arrived at Trares - ocean freight  
Place HF-2500 amplifier into trial service at Station 1 Commander amp and tube/transformer boxes  
Label, stow, and inventory new rotors Rotors from Trares and Idaho  
Label, stow, and inventory new Autek WM-1 (2 each) Autek WM-1  
Study possibility of adding ground power to irrigation controller    
Label, stow, and backup irrigation controller Spare irrigation controller, battery out  
Repair or replace East Sunroom airco    
Get Foscams online on new Huawei MODEM   New camera on hand, brought by K8ND
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Isolate problem and parts needs for Titan III    
Reinstall stop and retention bracket on front gate 3 each 5: x 3/8 concrete anchors  
Install new bedspread in East Sunroom   Light off-white spread
Two coats epoxy on new aircos EBR and ESR    
Repair bad tile in West Bathroom    
Thin out Shovic pile
Remove east sliding doors in preparation for Wiltraco October 18    
Restore Foscams to new modem or to ASUS    
Make entry into inventory for Huawei modem    
Thin out and organize WBR library    
Test then store ND8L 3CX1200A7    
Install cables and plugs on three new Bencher paddles    
Collect AL-1200(8), place in service, then store    
Make permanent repair of irrigation line under sidewalk and install new landscape border   27 foot x 20 cm landscape border
Begin painting sections on Europe tower    
Routine maintenance - Europe Beverage
Routine maintenance - US/JA Ridge Beverage
Install kick plate inside West Bathroom door Kick plate - D has dimensions  
Construct DC control board for W9NJY box, Ridge portion, and have it ready for install. See photos about Oct 20 2021.    
Tune 80 meter three element correctly    
US/JA tower ongoing corrosion control    
160 meter radial assessment and restoration    
Institutionalize RTTY at two stations    
Grip bar in West bathroom KB7Q grip bar  
Install manual alternative to 80 3el driven element loop switch    

February - April 2021

Project Need to Take On Hand or Buy Locally
Reinstall tile in EBR shower    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Build sarcophagus around WARC tower base   Cement, aggregate, plywood
Check if need to splint north leg US/JA just below 80 vee beam    
Repair red radial by Europe wall guy
     
Cut out tree branches touching Europe Stone guys    
Assess corrosion on Europe Tower in Year 3 of service life    
Reinstall top 10 yagi    
Install new monitor in East Sunroom    
Assess and design replacement of sliding glass doors in main room
Replace kitchen counter and backsplash tile
Install new equalizer plate on US/JA ocean guy Ordered 2 sets 3/4 inch big bolt 12 Dec 19 3 smaller hdwe sets on site, Box 373 WBR left closet floor center
Install control cable extensions so that 15 Meter System box reaches all stations    
Tune 80 meter three element correctly    
US/JA tower ongoing corrosion control    
160 meter radial assessment and restoration    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Grip bar in West bathroom KB7Q grip bar  
Install three additional Ring cameras Ring cameras and solar panels  

January - March 2020

Project Need to Take On Hand or Buy Locally
Reinstall tile in EBR shower    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install new rotor plate at rotor level in US/JA tower DXE stainless rotor plate  
Varnish pavilion oceanside outside   Paint brushes
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Build sarcophagus around WARC tower base   Cement, aggregate, plywood
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair   Bolts are on hand, doubler plate for rotor shelf is on hand
Check if need to splint north leg US/JA just below 80 vee beam    
Repair red radial by Europe wall guy    
Replace three dead plants in front    
Cut out tree branches touching Europe Stone guys    
Get exterminators back to spray inside and out    
Remove unneeded board under oceanside eave and trim and paint the area.    
Install new padlocks and keys per plan on laptop and clipboard All locks and keys new  
Install 4 SQ on Ridge 5 3/4 inch Al rods; roll of twine RG-6, connectors
Install new equalizer plate on US/JA ocean guy Ordered 2 sets 3/4 inch big bolt 12 Dec 19 3 smaller hdwe sets on site, Box 373 WBR left closet floor center
Install control cable extensions so that 15 Meter System box reaches all stations    
Tune 80 meter three element correctly    
US/JA tower ongoing corrosion control    
Varnish front gate    
160 meter radial assessment and restoration    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Grip bar in West bathroom Shop in Idaho  
Install all enhanced security features Ring cameras and other gadgets (motion sensor bulbs and silver tape and motion sensor in main room) per the design  

October - December 2019

Project Need to Take On Hand or Buy Locally
Test new 3CX1200A7 and then store and inventory it N5OT brings in November  
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install CQWW SSB temporary Beverage along seaside, then take it up to protect the wire after the contest Transformer, pre-made resistor termination, #14 wire, radial wires, coax, flexible conduit.  
Install four RG6 feedlines from shack to termination box across the road -- make it a permanent installation All components from ocean shipment  
Install new US/JA Beverage at beginning of the Ridge shelf microclimate, using about 840 feet of wire Wire and transformer and resistor from ocean shipment  
Install quick, modestly protected RG6 feedline from the termination box across the road to the antenna; be careful about goat problems on the rocks at the top of the cliff RG6 and watertight conduit from the ocean shipment  
     
Install new rotor plate at rotor level in US/JA tower   Epoxied rotor plate and U-bolts are on hand in EBR under West bed
Varnish pavilion oceanside outside   Paint brushes
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Build sarcophagus around WARC tower base   Cement, aggregate, plywood
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair   Bolts are on hand, doubler plate for rotor shelf is on hand
Check if need to splint north leg US/JA just below 80 vee beam    
Repair red radial by Europe wall guy    
Buy four new office chairs, donation offered by K8PGJ.    
Install new rotor in US/JA tower   T2X
Install control cable extensions so that 15 Meter System box reaches all stations    
Work on N7IR new RX cabling project All N7IR components via W8WTS  
Do layout and then start populating plaques above kitchen Plaques from Idaho and Ohio  
Get a Halotron fire extinguisher and move the old one to the East Sunroom    
Install all new hardline and connectors Hardline and connectors  
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Install and test new AL-1200 (7)    
Replace insulation on sunroom AC Insulated tubing from KB7Q  
Clean all airco filters    
Epoxy on water line and sunroom drain grates    
Assess Gene's 80 meter stub and store   On hand in cardboard boz
Verify correct connection of all stubs at bulkhead    
Install 6 meter bypass system    
Build secure vault in EBR    
Install Al trim at bottom of side gate    
Cut down dead tree branch threatening WARC guy wire    
Replace three dead trees in front    

January - March 2019

Project Need to Take On Hand or Buy Locally
Pot and tape guy wire ends and deadends on Europe tower as needed   Duct seal
Fully label all cables, especially remote, for easy re-installation New Avery labels  
Replace Bencher boom truss clamps with stainless Stainless steel saddle clamps  
Install aluminum rod splints on WARC tower legs 3/4 x 24 inches aluminum rods  
Replace 71 loose tiles in West Bedroom   Grout and adhesive
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Repaint blue end board, north and south   Coagulated blue paint
Replace broken toilet in West Bathroom   Kooyman replacement toilet, wax ring
     
     
Fresh varnish coats on inside and outside of front gate   Lenmar spar varnish
Install new three way and two way switches and cover plate in pavilion Parts from Bartlesville Home Depot  
Varnish pavilion oceanside outside   Paint brushes
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Build sarcophagus around WARC tower base   Cement, aggregate, plywood
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair   Bolts are on hand, Aluminum plate to make doubler plate for rotor shelf
Carefully assess feedline problems to SA and Pac yagis   Directional wattmeter
Assess problem with PJ2A rotor    
Meet with tax adviser and file by March 5    
Repair red radial by Europe wall guy    
Call A1 Pest Control    
Install control cable extensions so that 15 Meter System box reaches all stations    
VERONA rotor assessment    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Rebuild 40 meter inv vee   All parts on hand
New potted palm in pavilion bed    
New palm trees in front    
Complete rebalance and maintenance of irrigation system    
Reinstall failing wall tile in WBR    

 

October - December 2018

Project Need to Take On Hand or Buy Locally
Retune 6 meter yagi    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Varnish pavilion oceanside outside   Paint brushes
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Clean and re-seal traps on SA tribander   Replacement parts kit for A3
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair   Bolts are on hand, Aluminum plate to make doubler plate for rotor shelf
Troubleshoot and possibly replace air conditioner in West Bedroom    
Install new Europe tower    
Install new K3    
Assemble and test new AL-1200 (6)    
Repair red radial by Europe wall guy    
Call A1 Pest Control    
Install control cable extensions so that 15 Meter System box reaches all stations    
Assemble and reinforce XM-240    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Repaint blue gable if paint is still usable    
New potted palm in pavilion bed    
Assemble Bencher Skyhawk    
Fabricate Pacific tribander side mount plate    
     
     
     
     
     
     

 

January - March 2018

Project Need to Take On Hand or Buy Locally
Clean and coat from top 10 yagi to ground on US/JA    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Triage protection work on Europe tower   Paint brushes
Isolate problem and parts needs for Titan III    
Install new bedspread in East Sunroom   Light off-white spread
Clean and re-seal traps on SA tribander   Replacement parts kit for A3
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair   Bolts are on hand, Aluminum plate to make doubler plate for rotor shelf
Troubleshoot and possibly replace air conditioner in West Bedroom    
New connector on RX ant line at bulkhead Crimp connector and crimping tool  
Assess condition of Titan 425 and make parts list    
Repair LK-800 to obtain full power High voltage probe  
Repair red radial by Europe wall guy    
Call A1 Pest Control    
Install control cable extensions so that 15 Meter System box reaches all stations    
Further troubleshoot AL-1000 (1) if W8WTS was unsuccessful    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Repaint blue gable if paint is still usable    
New potted palm in pavilion bed    
Top to 40 feet careful protection of US/JA tower    
Assess sliding wheel assembly needed for main door and order some    
Assess sliding wheel assembly needed for Sunroom north door and order some    
Pay real estate tax Cash Bill on clipboard
Replace all upholstery straps on sofa and love seat Strapping and clips  
Re-install three tiles and nosing strip by cable head and re-grout   Mortar and grout
     
     

November - December 2017

Project Need to Take On Hand or Buy Locally
Clean and coat from top 10 yagi to ground on US/JA    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Triage protection work on Europe tower   Paint brushes
Troubleshoot US/JA 80 wire beam    
Install new bedspread in East Sunroom   Light off-white spread
Clean and re-seal traps on SA tribander Replacement parts kit for A3 (N7IR) N8LGP trap caps are on hand
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair Aluminum plate to make doubler plate for rotor shelf Bolts are on hand
Troubleshoot and possibly replace air conditioner in West Bedroom    
Inspect ground side of all guy assemblies before climbing    
Routine maintenance on Europe Beverage    
Routine maintenance on US/JA Beverage    
Repair red radial by Europe wall guy    
Call Curacao Pest Control    
Install control cable extensions so that 15 Meter System box reaches all stations    
Repair security system    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Install an up to date 2 meter FM transceiver    
New potted palm in pavilion bed    
New palm by West Bedroom patio    
Replace boom hardware on Force 12 with stainless 3 2" DXE stainless saddle clamps  
Repair dead phone line    
     
     
     
     
     
     

January - April 2017

Project Need to Take On Hand or Buy Locally
Inspect and triage rust on Europe tower from 70 foot point to top    
Clean and coat from top 10 yagi to ground on US/JA    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Repair Ridge 80 antenna and put ports and cables back to normal   Parts including BALUN from W8WTS
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Install new bedspread in East Sunroom Light off-white spread  
Clean and re-seal traps on SA tribander Replacement parts kit for A3 (N7IR) N8LGP trap caps are on hand
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair Aluminum plate to make doubler plate for rotor shelf Bolts are on hand
Label all with labelmaker    
Comb through all station assets and remove unneeded items and update inventory    
Preposition K3 drop cables and adapters in puuches    
Label micro ham boxes more logically, recable, and change labels on matrix and StackMatch boxes    
Repair red radial by Europe wall guy    
Call Curacao Pest Control    
Install control cable extensions so that 15 Meter System box reaches all stations    
Install new toilet and tank in East bathroom    
Repair poorly installed grout in main room    
Institutionalize RTTY at two stations    
Install an up to date 2 meter FM transceiver Radio from K2PLF  
Install new toilets in both bathrooms    
Varnish both sides of entry gate    
Remove cage from sea grape    
Pick up Certificate of Good Conduct and deliver to Bureau    
Scrape and two coat epoxy on Ridge tower    
Paint West Bedroom    
Repair security light East Sunroom    
Evaluate RRC jumpers and cables per KB7Q guidance    
Remove cacti and back planters    
     

 

November - December 2016

Project Need to Take On Hand or Buy Locally
Splint bad leg at 20 meter beam    
Inspect and triage rust on Europe tower from 50 foot point to top    
Clean and coat from top 10 yagi to ground on US/JA    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Replace Yawcam with something better W8WTS will bring new cams in November  
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies. Life preserver, buy on island  
Clean and re-seal traps on SA tribander Replacement parts kit for A3 (N7IR) N8LGP trap caps are on hand
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair Aluminum plate to make doubler plate for rotor shelf Bolts are on hand
Troubleshoot SWR on 6 meter yagi    
Install bypass valve on Ocean Shower Ball valve and copper fittings  
Disassemble washing machine cold feed and replace parts to stop fast leak Copper fittings  
Label all with labelmaker    
Comb through all station assets and remove unneeded items and update inventory    
Preposition K3 drop cables and adapters    
Label micro ham boxes more logically, recable, and change labels on matrix and StackMatch boxes    
Repair red radial by Europe wall guy    
     
Put spare parts inside W9NJY control box Parts kit marshaled in Idaho  
Call Curacao Pest Control    
     
Install new AL-1200 tube, burn in, then test at gradually increasing loads, then store in inventory in November Tube brought by N0YY  
Install AC transfer switch in laundry room    
Reinstall two new palm trees    
Install control cable extensions so that 15 Meter System box reaches all stations    
Install new mast in US/JA tower    
Reinstall remote control hardware and cabling at Station 4    
Install new toilet and tank in East bathroom    
Dig up and inspect all guy anchor rods at dirt line; repair as necessary    
Repair poorly installed grout in main room    
Troubleshoot Sony wireless headphones and return to States for repair as needed    
Solve TX delay problem so that AL-1200 T/R relays are not being hot-switched    
Institutionalize RTTY at two stations    
Scrape and paint rust from all security bars on East porch (some are rusted through)    
Assess condition of all FT-1000 and  Icom and Ten-Tec transceivers and initiate repairs where needed    
Install an up to date 2 meter FM transceiver Radio from K2PLF  

 

October 2016

Project Need to Take On Hand or Buy Locally
Inspect and triage rust on US/JA tower, particularly 50 feet and down    
Inspect and triage rust on Europe tower    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Replace Yawcam with something better W8WTS will bring new cams in November  
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies. Life preserver, buy on island  
Clean and re-seal traps on SA tribander Replacement parts kit for A3 (N7IR) N8LGP trap caps are on hand
Install new hardware and rotor on WARC tower and pack bad rotor for return and repair Aluminum plate to make doubler plate for rotor shelf Bolts are on hand
Troubleshoot SWR on 6 meter yagi    
Velcro IBS-1 to top under Station 2    
Label all with labelmaker    
Comb through all station assets and remove unneeded items and update inventory    
Preposition K3 drop cables and adapters    
Label micro ham boxes more logically, recable, and change labels on matrix and StackMatch boxes    
Repair red radial by Europe wall guy    
Install new electrolytics in AL-1200 (1) New caps are packed for travel Old capacitors are in Box 6 in EBR duct
Put spare parts inside W9NJY control box Parts kit marshaled in Idaho  
Troubleshoot Station 1 monitor VGA - HDMI adapter  
Repair Ridge 80 dipole    
Repair broken 80 two element wire beam    
Press Bureau Telecommunicatie for PJ2T letter of permission    
Call Curacao Pest Control    
Troubleshoot and repair low power out on LK-800    
Troubleshoot and repair low power out on Titan 425    
Install new AL-1200 tube, burn in, then test at gradually increasing loads, then store in inventory in November    
Install AC transfer switch in laundry room    
Reinstall two new palm trees    
Install control cable extensions so that 15 Meter System box reaches all stations    
Install new mast in US/JA tower    
Verify licensing status for WinTest    
Total Europe Beverage maintenance    
Total US/JA Beverage maintenance    
Reinstall remote control hardware and cabling at Station 4    
Install new toilet and tank in East bathroom    
Dig up and inspect all guy anchor rods at dirt line; repair as necessary    
Tape cable labels on switch panel so they are permanent    
     
Repair poorly installed grout in main room    
Troubleshoot Sony wireless headphones and return to States for repair as needed    
Solve TX delay problem so that AL-1200 T/R relays are not being hot-switched    
Institutionalize RTTY at two stations    
Scrape and paint rust from all security bars on East porch (some are rusted through)    
Assess condition of all FT-1000 and  Icom and Ten-Tec transceivers and initiate repairs where needed    
Install an up to date 2 meter FM transceiver Radio from K2PLF  
Buy and install new electric water heater    
Fix Zoom damage and install irrigation to the two new palm trees   All parts and fittings on hand
Repair broken reflector element on 80 meter wire beam    
     
     
     

 

February 2016

Project Need to Take On Hand or Buy Locally
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander   N8LGP trap caps
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Prewire SO2R at Station 1 (K6AM)    
Velcro IBS-1 to top under Station 2    
Label all with labelmaker    
Comb through all station assets and remove unneeded items    
Preposition K3 drop cables and adapters    
Label micro ham boxes more logically, recable, and change labels on matrix and StackMatch boxes    
Repair red radial by Europe wall guy    
Try swapping in some different electrolytics in AL-1200 (1) to stop burning smell   Capacitors are in Box 6 in EBR duct
     
     
     
     
Replace transition guy grips on Europe wall guy, mid level set.    
Call Curacao Pest Control    

 

November-December 2015

Project Need to Take On Hand or Buy Locally
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Install new cartridge at Garden shower Moen replacement 1222B  
Install working control diodes and lights for antenna matrix Repaired diode assemblies - N0YY  
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Move all control buttons to left side of stations    
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander   N8LGP trap caps
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Lube all coax connectors not on switch panel   Conductive grease
Add add'l Ethernet cables to 2-4 and two to Stations 1 and 5   N0YY color cables are on hand
Replace broken guy on WARC tower    
Dress all cables behind and below desks    
Prewire SO2R at Station 1 (K6AM)    
Velcro IBS-1 to top under Station 2    
Hang Station 6 coax cable off floor    
Label all with labelmaker    
Comb through all station assets and remove unneeded items    
Preposition K3 drop cables and adapters    
Install new LED tape at all four stations 3 rolls LED tape, 12 volt  
Label micro ham boxes more logically, recable, and change labels on matrix and StackMatch boxes    
Install switches and cables to pick RX from Stations 3 and 4 and run to SDR receiver location   Daiwa switches and coax jumper parts
Repair red radial by Europe wall guy    
Replace supply valve and cutoff valves in East Bedroom toilet   Valves
Diagnose problem with Ocean Shower Need new Moen shower cartridge pbly 1222B  
Build Station 5 for 15 meters and move control box from Station 3    
Replace transition guy grips on Europe wall guy, mid level set.    
Install and configure two IP cams    
Install RigRunner (5) on back of Station 1 amp table and connect 2 meters and flag cables to DC    
Call Curacao Pest Control    

October 2015

Project Need to Take On Hand or Buy Locally
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Assemble and install N0YY desks   Ocean shipment
     
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Install main room ceramic floor tile   Tile from Living Style - East Bedroom; acrylic prep; 10 sacks mortar from Kooyman; rental saw
Install WBR ceramic floor tile   Tile left from patio project - in WBR; acrylic prep; 8 sacks mortar from Kooyman; rental saw
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander   N8LGP trap caps
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Assemble new propane grill    
Install totally rebuilt shack with pushbutton switching system Top-Ten and WX0B components, N0YY mounting plate, adapters Blue StackMatch spray paint; white spray paint
Replace broken guy on WARC tower    
Repair red radial by Europe wall guy    
Diagnose problem with Ocean Shower Need new Moen shower cartridge pbly 1222B  
Troubleshoot diode assemblies for switch matrix    
Install and configure two IP cams    
Install RigRunner (5) on back of Station 1 amp table and connect 2 meters and flag cables.    
Call Curacao Pest Control    

 

January - April 2015

Project Need to Take On Hand or Buy Locally
Investigate 6 meter SWR problem and repair if necessary    
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Build new station tables to K6AM and N0YY dimensions    
Varnish interior pavilion ceiling   More Benjamin Moore stain
Stain interior pavilion ceiling   Benjamin Moore Fruitwood stain
     
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Resolve sliding screens problem   Curacao Aluminum has them for rebuild
Prime and paint all material for West soffit before installation    
Coat inside side of front gate with varnish    
Install K3 (2) at Station 2    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Install West soffit Aluminum nails (Amazon) 1 x 3 and plywood; roof bolts
Install mirror in outside ocean bathroom   Kooyman mirror
Repaint wall in pavilion out to pilaster north of man gate and urn   Comotex off white
Coat all roof terrace banisters with two coats Aqualux   Aqualux is on hand
Specify and buy lumber for West soffit   Kooyman
Specify and buy parts for West gutter   Kooyman
Install all terrace and West porch tile   Tile, tile rental saw, powerwasher, thinset mortar, stair nosing
Install gutter on West soffit   All parts from Kooyman
Scrub all concrete with bleach in prep for tile installation    
     
     
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander N8LGP trap caps  
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Assemble new propane grill    
     
     
Repair red radial by Europe wall guy    
     
     
     
     
Call Curacao Pest Control    

November/December 2014

Investigate 6 meter SWR problem and repair if necessary    
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Build new station tables to K6AM dimensions    
Varnish interior pavilion ceiling    
Obtain delivery on patio tile   Papers in ESR desk drawer
Renew sedula    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Resolve sliding screens problem    
Enable rotation of 40 yagi Fabricated tool and jig White or ivory epoxy finish paint
Install permanent AC to security light Flexible conduit and fittings  
Solve thread problem on man gate pillar lights    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Make notes on what new battery packs and carbide bits to get for the DeWalt    
Cut and take new shelf material for the NJY switch 16 x 22 1/4 Precut material (white)  
Repair 10 meter StackMatch problem    
Paint all new banisters with the Aqua Lux coating finish coat    
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander N8LGP trap caps  
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Plant new blue agave south of pavilion    
Install gutter and downspout system on west end of house after soffit project is complete    
Troubleshoot non-rotating Force 12 yagi    
Repair red radial by Europe wall guy    
Restore rotation to Force 12 yagi    
Plant replacement sea grape bush   Mendes
Replace defunct porch security cameras Cams from Amazon  
Install and connect W8WTS AC power system Rack from Ohio Transformer already on hand
Call Curacao Pest Control    

October 2014

Project Need to Take On Hand or Buy Locally
Investigate 6 meter SWR problem and repair if necessary    
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Build new station tables to K6AM dimensions    
Varnish interior pavilion ceiling    
Obtain delivery on patio tile   Papers in ESR desk drawer
Renew sedula    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Resolve sliding screens problem    
Enable rotation of 40 yagi Fabricated tool and jig White or ivory epoxy finish paint
Install permanent AC to security light Flexible conduit and fittings  
Solve thread problem on man gate pillar lights    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Make notes on what new battery packs and carbide bits to get for the DeWalt    
Cut and take new shelf material for the NJY switch 16 x 22 1/4 Precut material (white)  
Repair 10 meter StackMatch problem    
Paint all new banisters with the Aqua Lux coating finish coat    
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Get a life preserver and make it handy for emergencies.    
Clean and re-seal traps on SA tribander N8LGP trap caps  
New hardware and rotor on WARC tower Aluminum sheet to make doubler plate for rotor shelf Bolts are on hand
Plant new blue agave south of pavilion    
Install gutter and downspout system on west end of house after soffit project is complete    
Troubleshoot non-rotating Force 12 yagi    
Repair red radial by Europe wall guy    
Restore rotation to Force 12 yagi    
Plant replacement sea grape bush   Mendes
Replace defunct porch security cameras Cams from Amazon  
Install and connect W8WTS AC power system Rack from Ohio Transformer already on hand
     

January - April 2014

Project Need to Take On Hand or Buy Locally
Investigate 6 meter SWR problem and repair if necessary    
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Build new station tables to K6AM dimensions    
Repair bare areas then re-varnish pavilion interior ceiling    
Take apostille certified dissolution papers and copy of Cindy's passport to government to change her status   Papers in ESR desk drawer
Renew sedula    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones    
Cut and tune 40 backup vee for CW, test on air, stow legs vertically    
Paint East Sunroom compressor with finish epoxy   White or ivory epoxy finish paint
Finish US/JA Beverage maintenance    
Paint entire north elevation of house off white    
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Add more vegetation cover to hardline route on Ridge    
Cut and take new shelf material for the NJY switch 16 x 22 1/4 Precut material (white)  
Repair 10 meter StackMatch problem    
Initiate repair of banisters that are self-destructing with rebar rust    
Prototype K6AM lashup at Station 2    
Install new bedspread in East Sunroom Light off-white spread  
Repair rollers in East Sunroom north door    
Clean and re-seal traps on SA tribander    
New hardware in WARC rotor   Bolts are on hand
     
Install gutter and downspout system on west end of house after soffit project is complete    
Spackle and sand, then paint interior doors    
Sand and repaint bathroom cabinets in West bathroom    
     
     
     
     
     

November - December 2013

 Project  Need to Take  On Hand or Buy Locally
Investigate 6 meter SWR problem and repair if necessary    
Inspect and triage rust on US/JA tower    
Inspect and triage rust on Europe tower    
Assemble N0YY power console furniture    
Build new station tables to K6AM dimensions    
Repair bare areas then re-varnish pavilion interior ceiling    
Take apostille certified dissolution papers and copy of Cindy's passport to government to change her status   Papers in ESR desk drawer
Renew sedula    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Paint ceiling in East bedroom    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.     
Cut and tune 40 backup vee for CW, test on air, stow legs vertically    
Final inspect, secure, weatherproof, vandalproof Ridge tower and NJY switch box   Camo spray paint
Reinstall black plastic on cable bundle at bulkhead entry and re-hang cables correctly    
Paint East Sunroom compressor with finish epoxy   White or ivory epoxy finish paint
Paint entire north elevation of house off white    
Troubleshoot sunroom light sensor switch Work box mounted light sensor  
Convert Europe 80 beam to inverted vees 140 ft RG-8/X; balun  
Add more vegetation cover to hardline route on Ridge    
Make permanent new labels for all coax switches that apply    
Install attractive labels on W9NJY switch Printout on clipboard; file on laptop  
Cut and take new shelf material for the NJY switch 16 x 22 1/4 Precut material (white)  
Install filters on triplexer inlets Filter material from furnace filters  
Initiate repair of banisters that are self-destructing with rebar rust    
Prototype K6AM lashup at Station 2    
Load bureau drawers in sunroom    
Install new bedspread in East Sunroom Light off-white spread  
Repair rollers in East Sunroom north door    
Repair security light on East elevation of Sunroom    
Order new bed for East Bedroom    
Reinstall repaired SWR board in Titan III and test    
Clean and re-seal traps on SA tribander    
New hardware in WARC rotor   Bolts are on hand
Install new faucet in West bedroom Delta faucet from Idaho  
New float valve in East bathroom Parts from Ohio Home Depot  
Install gutter and downspout system on west end of house after soffit project is complete    
Spackle and sand, then paint interior doors    
Sand and repaint bathroom cabinets in West bathroom    
Double tie wrap overhead cables around south face of porch    

September 2013

Project Need to Take On Hand or Buy Locally
Remove TA-34 XL from Ridge tower and mark for easy reassembly, then disassemble, pack and store including all hardware    
Install TA-34 XL as Pacific multiplier antenna on Europe tower    
Assemble Bencher Skyhawk on Ridge with riveted construction and modification kit and new balun and test SWR    
Install Bencher Skyhawk on Ridge tower    
Deinstall RCS-4 remote coax switch from Ridge and shack    
Install W9NJY/N0YY high power remote coax switch on Ridge tower and in shack Switch and necessary connectors  
Remove CL-33 from US/JA tower, revert to original three band design, find good traps, mark, disassemble, and pack and store    
Assemble C-3E/H and test    
Install C-3E/H on US/JA tower    
Fabricate 80 meter boom end caps to retain rope on pulley and install 1/16 inch aluminum sheet stock and self-tapping stainless screws  
Assemble 80 meter boom including drilling rope holes and rope hook eyes and rope    
Set up coax feedline pull arrangement and install 80 meter boom on US/JA tower    
Install new RG-213 feedline to 80 meter two element wire beam    
Install 80 meter wire elements, tuning reflector 100 KHz below center frequency    
Recable 10 meter US/JA stack with impedance matching coax section and test Cable transformer harness and connectors kit  
Relocate Heliax hardline from 10 and 15 meter stack boxes on US/JA tower into shack using extended coax feedlines More tie wraps  
Breadboard and test triplexer module    
Investigate 6 meter SWR problem and repair if necessary    
Permanently install triplexer module with modified shack switching and switch labeling    
Install old Ridge RCS-4 remote coax switch at Europe Beverage feedpoint and in shack    
Install US/JA Beverage along cliff top with separate ground systems Beverage wire, transformer, ferrites, termination kit, ground wires  
Install new 160 meter TX antenna with new antenna wire and rope; tune to 1.830    
Install new feedline to 160 meter TX antenna PL-259s  
Install new 30 meter inverted vee wire    
Inspect and triage rust on US/JA tower   Signal Blue epoxy paint
Inspect and triage rust on Europe tower    
Install new telephone in East Sunroom Garage sale Uniden system  
Assemble N0YY power console furniture    
Assemble and test AL-1200 (5) then store in spares stock    
Test and burn in FT-1000 (5) and stow in protective bag in closet    
Build new station tables to K6AM dimensions    
Repair bare areas then re-varnish pavilion interior ceiling    
Take apostille certified dissolution papers and copy of Cindy's passport to government to change her status    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Harden all wiring to the security panel or relocate panel to an inaccessible location    
Paint ceiling in East bedroom    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.     
Install backup 40 meter antenna    
Initiate repair of banisters that are self-destructing with rebar rust    
Prototype K6AM lashup at Station 2    
Install gutter and downspout system on west end of house after soffit project is complete    
Spackle and sand, then paint interior doors    
Sand and repaint bathroom cabinets in West bathroom    
Obtain and install 18,000 BTU "Inverter" air conditioner in East Sunroom (Wimco)    
Order new bed for East Bedroom if order can be filled in time. Use the extra one for CQWW CW.    
Reinstall repaired SWR board in Titan III and test K6AM repaired SWR board  
Clean and re-seal traps on SA tribander    

 

January - April 2013

Project Need to Take On Hand or Buy Locally
Build new station tables to K6AM dimensions Specifications  
Pay property tax Cash and statement of charges  
Seal roof hardware   Roof tape
Sand and refinish inside of driveway gate


 
  Stain (see blue file for color) Polyurethane has poor UV resistance.
Sand and refinish outside of driveway gate


 
  Stain (see blue file for color) Spar varnish is made to flex and may not have best UV resistance, but is better than polyurethane.
Repair bare areas then re-varnish pavilion interior ceiling    
Repair or rebuild East soffit    
Take dissolution papers and copy of Cindy's sedula to government to change her status Dissolution papers, copy of C's sedula and passport  
Measure Europe tower splices for bigger pieces (WB9Z)    
Neaten BandMaster III installation at Station # 1 and install BM III console on switch panel Aluminum angle  
Neaten up all station wiring, clean, re-label, remove anything not needed    
Plant along front wall so that plants are symmetrical    
Clean all landscaping light lenses and install custom brackets Custom brackets  
Install PC 36 after installing balance of software PC36  
Install new hard drive in PC32 and configure New PC32 hard drive  
Reinstall good hard drive in PC30 Old good PC30 hard drive  
Reattach work boxes to wall at front gate    
Install aluminum water dam system on steps   W9VA brings aluminum pieces
Seal step closet roof with epoxy    
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Install new IBS-1 at Station 2    
Harden all wiring to the security panel or relocate it to an inaccessible location    
Inspect guy connections on Europe tower that are not potted in putty; replace as necessary     
Replace mast of Ringo Ranger    
Paint ceiling in East bedroom    
Buy TV no bigger than 16 H x 24 W for Sunroom or for East Bedroom    
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.     
Replace pillar lights on man gate    
Repair Titan III   W9VA brings the relays
Install backup 40 meter antenna Balun, wire, and insulators RG-8X
Initiate repair of banisters that are self-destructing with rebar rust    
Prototype K6AM lashup at Station 2    
Remove dead sea grape tree and fix irrigation there    
Separate messenger cables and PJ9JT tower legs    
Install gutter and downspout system on west end of house after soffit project is complete    
Touch up paint on metal patio furniture    
Spackle and sand, then paint interior doors    
Sand and repaint bathroom cabinets in West bathroom    
Obtain air conditioner for sunroom    
Install new phone in sunroom    
Lube valve and install new control on East bedroom shower    
Repair LK-800    
Paint rear planters    
Sand and refinish inside/outside of man side gate    
     
     
     

November - December 2012

Project Need to Take On Hand or Buy Locally
Seal roof hardware Kit via W9VA and 5 additional rolls with W0CG
Sand and refinish inside of driveway gate   Stain (see blue file for color) Polyurethane has poor UV resistance.
Sand and refinish outside of driveway gate   Stain (see blue file for color) Spar varnish is made to flex and may not have best UV resistance, but is better than polyurethane.
Repair and stain and varnish on man gate    
Repair bare areas then re-varnish pavilion interior ceiling    
Repair or rebuild soffits
Take dissolution papers and copy of Cindy's sedula to government to change her status Copy of sedula; dissolution papers  
Remove first splice on Europe tower and inspect underneath; re-install if all is good; full tower inspection by W2GD
Neaten BandMaster III installation at Station # 1 and install BM III console on switch panel Aluminum angle Stainless hardware
Neaten up all station wiring, clean, re-label, remove anything not needed
Plant along front wall so that plants are symmetrical
Replace light bulbs in two planter fixtures and re-weatherproof and retrofit covers Bright daylight bulbs
Re-attach work boxes to wall at front gate
Make cement dams to direct water down steps to gutter Reinforcing hardware and concrete forms and hardware
Seal step closet roof with epoxy to direct water to the drain inlet
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Install new IBS-1 at Station # 2 IBS-1 bought from N5CQ and from K1XM
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker 
Inspect guy connections on Europe tower that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Take photos of installation and scan drip system controller documentation
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Paint ceiling in East bedroom Benjamin Moore super white paint
Buy TV no bigger than 16 H x 24 W for Sunroom or for East Bedroom
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.  Valves, access box, all PVC fittings, irrigation controller. 
Inspect and maintain US/JA Beverage wire and termination  
Inspect and maintain Europe Beverage wire and termination    
Inspect and maintain Ridge tower and wire antenna    
Replace pillar lights on man gate Different design pillar lights  
Repair Titan III Chimneys  
Install backup 40 meter antenna Balun and wire and insulators RG-8/X
Initiate repair of bannisters that are self-destructing with rebar rust    
Troubleshoot bad shack airco wattmeter    
Troubleshoot DE on CL-33    
Buy new controllers for Westinghouse airco units - Wimco    
DXE 4-Square realignment project
Order Queen bed and mattress and frame for West bedroom    
Repair Titan 425    
Troubleshoot two bad Inspiron 550 PCs New power supplies  
Prototype K6AM lashup at Station 2    

February - April 2012

Project Need to Take On Hand or Buy Locally
Remove old broken table to a safe and secure location
Repair soffits
Final inspection of all taped leg areas on Europe tower; repair as needed
Provide papers for Cindy's passport to notary Document on clipboard  
Pick up repaired cushion from seamstress    
Take dissolution papers and copy of Cindy's sedula to government to change her status Copy of sedula; dissolution papers  
Remove first splice on Europe tower and inspect underneath; re-install if all is good
Inspect guy connections on U.S. tower that are not potted in putty; replace as necessary 
Open all guy attachments at ground and inspect for Europe tower
Open all guy attachments at ground and inspect for U.S. tower
Install new bathroom sink outside Faucet and drain tail  
Initiate CFI renewal 2096946CFI issued 29 April 2010; comm pilot 2096946 issued 10 May 2010; medical issued June 3, 2008 examiner 05165-1 Charles L. Henault, MD  
Neaten BandMaster III installation at Station # 1 and install BM III console on switch panel Aluminum angle Stainless hardware
Neaten up all station wiring, clean, re-label, remove anything not needed
Plant along front so that plants are symmetrical
Replace light bulbs in two planter fixtures and re-weatherproof Bright daylight bulbs
Re-attach work boxes to wall at front gate
Inspect overhead cable messenger and bundle and repair as needed
Get shack air conditioner working
Make cement dams to direct water down steps to gutter Reinforcing hardware and concrete forms and hardware
Seal step closet roof with epoxy to direct water to the drain inlet
Prune everything
Seal roof hardware Kit via W9VA and 5 additional rolls with W0CG
Repair lawn mower   New blade, new pull chain
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Install new IBS-1 at Station # 2 IBS-1 bought from N5CQ and from K1XM
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker 
Inspect guy connections on Europe tower that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Take photos of installation and scan drip system controller documentation
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Paint ceiling in East bedroom Benjamin Moore super white paint
Reverse refrigerator door    
Replace sink drain assembly in East bedroom New bathroom faucet
Replace faucet in West bathroom  Faucet is on hand
Buy TV no bigger than 16 H x 24 W for Sunroom or for East Bedroom
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.  Valves, access box, all PVC fittings, irrigation controller. 
Pay real estate taxes Statement and cash
Reverse refrigerator door    
Replace EBR toilet valve   Valve in stock at Signal Point
Replace damaged facing edge tile in EBR    
     
     
Install drop cable from TV receiver to East BR TV    

October - November 2011

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Install new IBS-1 at Station # 2 IBS-1 bought from N5CQ and from K1XM
Hand NAfl 750,00 to PJ2CFM and the list of members for VERONA Cash, list of stateside members
Breadboard 2O2R circuitry and station setup at Station # 2 and determine what will be needed to make this permanent Design documents and K6AM and Top-Ten parts
Deposit $666 from CG/Curacao Group into MCB for CCC legal fees Cash
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker 
Inspect guy connections on all towers that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Create N9AG memorial photo Framed photo
Take photos of installation and scan drip system controller documentation
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Paint ceiling in East bedroom Benjamin Moore super white paint
Get beach sand for Laurie
Get a new refrigerator
Replace sink drain assembly in East bedroom New bathroom faucet
Replace faucet in West bathroom  Faucet is on hand
Install new kitchen faucet New faucet set
Install workaround at Station 1 to control the Top Ten relay box from the computer or from the Band Data output on transceiver Devices and cables as prototyped in Idaho; Array Solutions BM-III ?
Buy TV no bigger than 16 H x 24 W for Sunroom or for East Bedroom
Install Orbit irrigation control system and re-plumb buried lines to convert to two zones.  Valves, access box, all PVC fittings, irrigation controller. 
Test W8AV key set W8AV key set
Install as many new Windows 7 boxes as are available, fully configured PCs and Keyspan adapters and cables

 

Continue tower rust detection and correction, starting at second guy point and upward

 

January 21 - April 6 2011

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Update key set at INTAC  Known good keys
Validate hidden key set at Signal Point Known good keys
Install watthour meter in shack air conditioner circuit Watthour meter
Identify Cribal Front key from master set and duplicate as needed Total key bag
Install feedline for 6 meter yagi as F1, F2, or F3 at stations 1 and/or 2 as appropriate
Continue as much inspection as time allows on both Rohn towers. Repair, reseal, and log as necessary.
Regenerate PC21  All software is available on site or online 
Meet with Carol Krekko 10:00 Wed Mar 30 at Alexander and Simon Law Office Esther@Alexander-Simon.com . Copy of deed
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker (W9JUV)
Repair facing edge tiles in West bathroom Tiles from Maley's
Inspect guy connections on all towers that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Install K8LEE mods in AL-1200 (1) for high voltage K8LEE kit
Install K8LEE mods in AL-1200 (2) high voltage K8LEE kit
Install K8LEE mods in AL-1200 (3) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Build a permanent inv vee for 80 out the top of the Ridge tower Insulators, balun, earth anchors, pipe straps, turnbuckles Antenna wire, coax, coax connectors, rope
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Attempt to meet with Mr. de Canha
Paint ceiling in East bedroom Benjamin Moore super white paint
Install new network drive onto Ethernet MyBook 2 TB drive 
Block off entry door to warehouse
Replace anchor post for 160 Inv L
Install final guy replacement - Europe bottom wall guy Dead ends

December 2 - 15 2010

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Replace glass in small patio table Tempered glass - Marchena
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Replace broken tiles on kitchen counter  Tiles from broken bag and Goose, in WBR, second drawer
Accomplish total equipment fuse assessment and inventory and update online
Install feedline for 6 meter yagi as F1, F2, or F3 at stations 1 and/or 2 as appropriate
Continue as much inspection as time allows on both Rohn towers. Repair, reseal, and log as necessary.
Revarnish front gate, both sides, and side man gate Benjamin Moore 404 spar varnish
Fix seat backs of office chairs Hardware
Repair three of four green chairs  Screws and glue
Install permanent base for 160 TX antenna Aluminum tubing is on site 
Install new T/R relay board in AL-1200 (2) N0YY will obtain board and ship to N4RV 
Install new T/R relay in Titan III N4RV will obtain relay and bring to island  
Regenerate PC21  All software is available on site or online 
Contact Esther Steenbar, of Alexander and Simon Law Office Esther@Alexander-Simon.com . Copy of deed
Replace knob on EBR shower control  Moen part number 115000
Upgrade WL to 10.82 at Station # 1
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker (W9JUV)
Repair facing edge tiles in West bathroom Tiles from Maley's
Repair tiles in kitchen counter Tile from Goose
Inspect guy connections on all towers that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Install K8LEE mods in AL-1200 (1) for high voltage K8LEE kit
Install K8LEE mods in AL-1200 (2) high voltage K8LEE kit
Install K8LEE mods in AL-1200 (3) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Build a permanent inv vee for 80 out the top of the Ridge tower Insulators, balun, earth anchors, pipe straps, turnbuckles Antenna wire, coax, coax connectors, rope
Install permanent condensate line for shack air conditioner  Conduit, fittings, brackets
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Attempt to meet with Mr. de Canha
Paint ceiling in East bedroom Benjamin Moore super white paint
Block off entry door to warehouse
Replace electric eye on front gate security lights Bench stock electric eye
Replace anchor post for 160 Inv L
Install final guy replacement - Europe bottom wall guy Dead ends

October 21 - November 6 2010 

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Replace glass in small patio table Tempered glass - Marchena
Take Station 3 filter panel off the wall and find the bad ground that is injecting noise into the RX. It is S5 severe on 40 meters.    
Replace broken tiles on kitchen counter  Tiles from broken bag and Goose, in WBR, second drawer
Continue as much inspection as time allows on both Rohn towers. Repair, reseal, and log as necessary.
Contact Esther Steenbar, of Alexander and Simon Law Office Esther@Alexander-Simon.com . Copy of deed
Replace knob on EBR shower control  Moen part number 115000
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker (W9JUV)
Repair facing edge tiles in West bathroom Tiles from Maley's
Inspect guy connections on all towers that are not potted in putty; replace as necessary  Dead ends; duct seal; Scotch 33 
Assemble AL-1200 (3), log it into inventory, and set up AC and fan speed taps RF deck, transformer 
Log in FT-2000 (3) into inventory; test  FT-2000 (3) (N8NR) 
Install K8LEE mods in AL-1200 (1) for high voltage K8LEE kit
Install K8LEE mods in AL-1200 (2) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Attempt setup for 6 M EME QSO (K9SG) Notes on clipboard
Assess Maley security camera system and study what is feasible to install
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Build a permanent inv vee for 80 out the top of the Ridge tower Insulators, balun, earth anchors, pipe straps, turnbuckles Antenna wire, coax, coax connectors, rope
Install permanent condensate line for shack air conditioner  Conduit, fittings, brackets
Order Wimco 36,000 BTU A/C  THHN wire for AC #8, unfused cutoff box, work boxes and cover plates, conduit connectors
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Paint ceiling in East bedroom Benjamin Moore super white paint
Block off entry door to warehouse
Replace electric eye on front gate security lights Bench stock electric eye
Replace anchor post for 160 Inv L
Recoat WARC tower Stone guy anchor
Install final guy replacement - Europe bottom wall guy Dead ends

 

September 11-23 2010 

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Install new phone with remote handset in East Sunroom Phone
Do as much inspection as time allows on both Rohn towers. Repair, reseal, and log as necessary.
Harden all wiring to the security panel or relocate it to an inaccessible location Two conductor mouse-proof wire from Ueckert locker
Repair facing edge tiles in West bathroom Tiles from Maley's
Apply for bulk callsigns, including PJ4A (clipboard) Packet and USD cash
Pay for TDS up to date
Pay for Fatum for annual policy renewal Policy papers from mailbox
Replace dead oceanside palm tree Ramon, 869.8221 or 677.4810 (clipboard)
Install K8LEE mods in AL-1200 (old one) for high voltage K8LEE kit
Install K8LEE mods in AL-1200 (new one) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Log in and test FT-1000 (7)  FT-1000 (7)
Pay Zoom July-Oct
Attempt setup for 6 M EME QSO Notes on clipboard
Assess Maley security camera system and study what is feasible to install
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Build a permanent inv vee for 80 out the top of the Ridge tower Insulators, balun, earth anchors, pipe straps, turnbuckles  Antenna wire, coax, coax connectors, rope
Replace the dead end on US/JA tower, top ocean guy, where the tails are not covered by tape or putty Phillystran dead end
Continue with WIMCO on air conditioning project - K9SG says 40,000 BTU or better
Replace mast of Ringo Ranger Galvanized or aluminum tubing
Paint ceiling in East bedroom Benjamin Moore super white paint
Block off entry door to warehouse
Replace anchor post for 160 Inv L
Recoat WARC tower Stone guy anchor
Install final guy replacement - Europe bottom wall guy

 

January - April 2010

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Sections 8, 7 of Europe tower, aggressively clean rust spots and re-prime and re-coat. 
Get BVU QSL for N7KA@comcast.net Arne
Apply for ARRL SSB callsign for WB9Z
Repair facing edge tiles in West bathroom Tiles from Maley's
Install K8LEE mods in AL-1200 (old one) for high voltage K8LEE kit
Install K8LEE mods in LK-800 (new one) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Design shelving unit for rotors and Stackmatch boxes to clean up table on Station # 1.       
Shop for furniture piece that will serve as power console and chaos table    Dimensions
Get VERONA shirts made for CCC
Continue with WIMCO on air conditioning project- K9SG says 40,000 BTU or better
Install new RX switching system, Stations 3 and 4 K9AY box
Paint ceiling in East bedroom Benjamin Moore super white paint
Replace Moose Systems security panel with new one and establish connectivity with Curacao surveillance services Security panel and associated equipment
 
Assess all tower paint needs from Eur 70 foot down and on US/JA and paint 
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho
Install final guy replacement - Europe bottom wall guy

 

 

November - December 2009

Project Need to Take On Hand or Buy Locally
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Sections 8, 7 of Europe tower, aggressively clean rust spots and re-prime and re-coat. 
Install new fixtures on pillars at man gate Light fixtures and bulbs
Apply for PJ2DX license renewal
Repair facing edge tiles in West bathroom Tiles from Maley's
Install K8LEE mods in AL-1200 (old one) for high voltage K8LEE kit
Install K8LEE mods in LK-800 (new one) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Design shelving unit for rotors and Stackmatch boxes to clean up table on Station # 1.       
Shop for furniture piece that will serve as power console and chaos table    Dimensions
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho
Install flood lighting on south lawn area, including indoor defeat switch Work boxes, conduit fittings, wire, electric eye, switch
Install timers on selected interior lights and TV set Non 60 HZ timers
Fabricate two dollies for A/C ducts 8 casters Plywood
Paint ceiling in East bedroom Super white paint
Clean and repaint laundry room Super white paint, Comoline grey
Install RigBlaster at Station # 1 for RTTY and digital modes All cables and software
Test N8NR point and shoot modified rotor box from N0YY and install if it works Rotor box from N0YY
Replace glass in West bedroom frame Locally cut glass
Install glass in N1ZZ art Locally cut glass
Research what is necessary to get VERONA golf shirt order accomplished      
Varnish front gate - outside side Marine varnish
Apply epoxy primer to drain grates Primer and hardener
Repair TV outlet wiring Transformer adapter
Emergency maintenance on 40 meter mast Epoxy paint and sander
Install light-activated light controls in sunroom Electric eye and box
Install light-activated light at NW corner of house Westek electric eye
Install the two surplus security cameras From sunroom storage
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho

 

October 2009

Project Need to Take On Hand or Buy Locally
Perform power loss test to tower site and document online (MFJ and Galm?) Bird wattmeter (N0YY) Dummy load and wattmeter
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Top two sections of Europe tower, aggressively clean rust spots and re-prime and re-coat.  Cheap tape, epoxy primer and finish coat
Install new fixtures on pillars at man gate Light fixtures and bulbs
Repair hoses Hose repair kits
Paint ceiling in East bedroom Super white paint
Install RigBlaster at Station # 1 for RTTY and digital modes All cables and software
Install two new Dell machines in test mode on Ethernet Dell PCs
Store new cable adapters for FT-2000 in coax connectors kit New adapters from CableMaster
Make hanger for Yaesu banner and put it up
Test N8NR point and shoot modified rotor box from N0YY and install if it works Rotor box from N0YY
Stock repaired rotor (CCC Rotor 3) from N0YY Rotor from N0YY
Attempt repair of Alpha 76A (Arizona) K6AM
Shoot multiple Yaesu photos
Replace glass in West bedroom frame Locally cut glass
Install glass in N1ZZ art Locally cut glass
Restock repaired Yaesu Heil pigtails from W8TK Repaired pigtails
Open a bagged radio (FT-2000) and inspect condition of rig and of dessicant
Install K8LEE mods in AL-1200 (old one) for high voltage K8LEE kit
Install K8LEE mods in LK-800 (new one) high voltage K8LEE kit
Install new parasitic suppressor in LK-800 and test K8LEE kit
Research what is necessary to get VERONA golf shirt order accomplished      
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Design shelving unit for rotors and Stackmatch boxes to clean up table on Station # 1.       
Install prototype 80 meter wire antenna on Ridge lnsulators from Dayton, RG8/X ($0.59/foot)
Shop for furniture piece that will serve as power console and chaos table    Dimensions
Design RTTY system and make it easy to invoke at Station # 1 with XP computer in service    Rigblaster Pro or integrated WL MMTTY
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho
Retrieve schematic for Rotor EZ
Install new screws in Titan II cabinet Screws
Repair Astron RS-35

 

July 2009

Project Need to Take On Hand or Buy Locally
Perform power loss test to tower site and document online (MFJ and Galm?)    Dummy load and wattmeter
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Continue replacement of the last six guy wire tails and assemblies      
Research what is necessary to get VERONA golf shirt order accomplished      
Repair and reinstall 2 meter Ringo Ranger broken radial  Rethreaded rod
Install FT-2000 and run it heavily in IARU contest  K9SG FT-2000
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Design shelving unit for rotors and Stackmatch boxes to clean up table on Station # 1.       
Install new knobs on coax switches Knobs from Dayton
Install prototype 80 meter wire antenna on Ridge lnsulators from Dayton
Test RCS-4 switching system on Ridge Backup RCS-4 control box from Dayton RCS-4 control and switch boxes; adapter cables; coax pigtails.
Shop for furniture piece that will serve as power console and chaos table    Dimensions
Buy a flat screen monitor for the laptop and transport it Flat screen monitor   
Design RTTY system and make it easy to invoke at Station # 1 with XP computer in service    Rigblaster Pro or integrated WL MMTTY
Add new hardware to fan stilt kit box and update stilts on bad fans.   Stilt kit hardware Y
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho

 

January-April 2009

Project Need to Take On Hand or Buy Locally
Perform power loss test to tower site and document online (MFJ and Galm?)    Dummy load and wattmeter
Attempt repair of FT-1000 (2) with linear keying problem and return to the States if necessary      
Transport empty Cabbage Case to island for standby for next transceiver repair Cabbage Case   
Install an outlet on roof    Conduit, clamps, wire all on hand 
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem     Traps
Implement W8WTS design for 160 DSL fix All K8ND-ordered components
Continue replacement of the last six guy wire tails and assemblies      
Repair and reinstall 2 meter Ringo Ranger broken radial    Rethreaded rod
Do spot maintenance on all security bars    Ivory paint
Locate garage plans and adapt design to new objective with DROV input Plans from Idaho   
Reinstall metering board in Titan II and test Repaired board(s) from Ten-Tec   
Install new power resistors in Titan I and test Resistors from N1ZZ   
Test Arizona Alpha, clean it, and try to get reliable operation Fuses, 1 1/4 amp   
Troubleshoot K4 relay problem in Alpha 76 and order parts if necessary      
Test WI9WI Alpha and log the test data online      
Design shelving unit for rotors and Stackmatch boxes to clean up table on Station # 1.       
Shop for furniture piece that will serve as power console and chaos table    Dimensions
Install WL 10.69 on all machines      
Triage all PCs and update their status online      
Test Shovic PC and reinstall SAM and music software      
Trim suckers from East tree      
Install all PJ2T software on Cindy's XP computer and put it in service at Station # 1 as a test for XP compatibility      
Buy a flat screen monitor for the laptop and transport it Flat screen monitor   
Get crews to paint bottom 20 feet of Europe tower    Paint
Get crews to paint bottom 15 feet of US/JA tower    Paint
Aggressively sand and paint US/JA sections 3, 4 Sanding discs   
Spot maintenance on US/JA sections 5, 6, 8    Paint
Design RTTY system and make it easy to invoke at Station # 1 with XP computer in service    Rigblaster Pro or integrated WL MMTTY
Aggressive pruning and removal of vegetation at northeast corner of yard      
Install outdoor shower at new wall     Moen shower fixture and adapters for PVC connection, drain kit from Idaho
Replace irrigation computer and calibrate Gardena computer
Add two more safety guys to Ridge tower EHS, dead ends
Send Titan III QSK board home with K8ND for repair
Refinish south side of driveway gate Makita sander, stain, varnish
Add conduit sheath to Ridge backup guys Flex conduit
Troubleshoot Titan III standby/operate hangup
Replace irrigation computer and calibrate Gardena computer
Add two more steel guys to Ridge tower EHS
Send Titan III QSK board home to K8ND
Troubleshoot Titan III standby/operate hangup
Revarnish south side of driveway gate Power sander
Add protective flex conduit to Ridge backup guys Flex conduit
Sand, stain, varnish man gate Makita sander   

 

November/December 2008

Project Need to Take On Hand or Buy Locally
Perform power loss test to tower site   Dummy load and wattmeter
Troubleshoot bad FT-1000 Field and return to US if necessary Cabbage Case  
Install repaired FT-1000 (3) and test FT-1000 (3) from W0CG  
Install an outlet on roof   Conduit, clamps, wire all on hand 
Install repaired FT-1000 (1) and test FT-1000 (1) from K8MR  
Install repaired FT-1000 (5) and test FT-1000 (5) from ?  
Install redundant guy wire set on Ridge antenna Phillystran, clips, anchors  
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Install one or two more U-bolts in US 15 mast plate and weatherproof.  Bolts from Home Depot are at QTH
Test radials in area of new gate and wall parabola and repair where necessary
Complete painting of security bars - focus on West main door and laundry room    
Test John PC with new power supply. If no go, put wireless card in Cindy PC and test.  Dell Optiplex Wireless G card on hand in West bedroom
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Repair and reinstall 2 meter Ringo Ranger broken radial Rethreaded rod
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection, drain kit
Sand, stain, varnish man gate Makita sander
Get both air conditioners repaired    

September 2008

Project Need to Take On Hand or Buy Locally
Make up feedline pigtail for ridgetop    
Scrape, prime, and paint two sections of Rohn 25G for ridge tower    
Open up mystery yagi and assemble, clean, test, then paint with camo paint and prep to carry in pieces to ridge top    
Install tower on ridge top  New drill Radials kit is on hand
Epoxy exposed hardware then spray on camo paint   Spray paint
Slit road and install two 2" conduits   Conduits, fittings, sand, gravel + Ribert
Install RG-218/U through conduit to PJ9JT tower vicinity and waterproof fittings    
Install WB9Z hardline from PJ9JT to shack and weatherproof    
Perform power loss test to tower site   Dummy load and wattmeter
Select mast material and weatherproof it    
Install yagi on tower and weatherproof all hardware and connections    
Install an outlet on roof   Conduit, clamps, wire all on hand 
Get WA9S design suggestions for roof terrace finish off    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Install one or two more U-bolts in US 15 mast plate and weatherproof.  Bolts from Home Depot are at QTH
Test radials in area of new gate and wall parabola and repair where necessary
Complete painting of security bars - focus on West main door and laundry room    
Test John PC with new power supply. If no go, put wireless card in Cindy PC and test.  Dell Optiplex Wireless G card on hand in West bedroom
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Repair and reinstall 2 meter Ringo Ranger broken radial Rethreaded rod
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Order one new bed for West bedroom Beds
Get new outside water meter installed    
Make contact with key officials at Aqualectra to get noise fixed Take powerful squirt rifle  

 

July 2008

Project Need to Take On Hand or Buy Locally
Make up feedline pigtail for ridgetop    
Pay CY 2007 real estate taxes Stmt  
Initiate renewal of residency document Insurance proof  
Apply sealant to grout on new East porch    
Build bench seat on roof terrace    
Install sprinkler system for sunroom lawn Complete new system 1/2 inch pipe, 8 lengths 6 meters each
Install radial extensions with irrigation system   More # 14 Cu
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Test radials in area of new gate and wall parabola and repair where necessary
Complete painting of security bars - focus on West main door and laundry room    
Have Herko scrape and paint Europe sections 10, 9, 8, 7, 6 Paint, brushes, gloves
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Repair and reinstall 2 meter Ringo Ranger broken radial Rethreaded rod
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Order one new bed for West bedroom Beds
Clean and thin all vegetation along cliff top    
Get new outside water meter installed    
Make contact with key officials at Aqualectra to get noise fixed Take powerful squirt rifle  
Varnish pavilion ceiling Dropcloths Varnish and brushes
Get license for John Laney, confirm PJ2X for Marko Paperwork packets  
Update West bedroom box labels    
Replace DE insulator on SA yagi and weatherproof New Cush-Craft parts  
Replace Station # 1 Dow-Key coax switch New rotary switches from Dayton  
Install new cartridge in outdoor shower valve Cartridge  
Install stick on conduit for main room Internet cable   Male-male block
Troubleshoot linear 2 amp keying    
     

 

February/March 2008

Project Need to Take On Hand or Buy Locally
Install hardline as much as connectors will permit on mountain W8WTS splice kits, hardline connectors, plans Cans of camouflage spray paint
Select two good 25G sections and clean and paint for ridge antenna   Mast material, hardware for sections
Open and assemble tribander and test for ridge installation, then disassemble Earth anchors, phillystran, clips, turnbuckles  
Install tower and beam on ridgetop Type N AC power adapter connectors, preassembled coax pigtail  
Bring back DX Doubler manual    
Initiate installation of coax switching panels, Station 1 relocation complete Switch panel assemblies and connectors, coax, specialized hardware, plans  
Reinstall band switch in Titan II and test Band switch (W0NB via Africa)  
Clean and lube sliding glass doors    
Replace screen in east door opening and repair frame    
Pay CY 2006 real estate taxes Stmt  
Clean/paint east porch including ceiling    
Initiate renewal of residency document Insurance proof  
Apply sealant to grout on new East porch    
Repaint low planters on back patio    
Build bench seat on roof terrace    
Hang artwork from St. John in East Sunroom Art piece  
Order two sun lounges from Karnak    
Shop for sofa for East porch    
Install sprinkler system for sunroom lawn Complete new system 1/2 inch pipe, 8 lengths 6 meters each
Install radial extensions with irrigation system   More # 14 Cu
Repaint inside of wall   Paint
Repaint "PJ2T" lettering at wall and Howard names on mailbox    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Test radials in area of new gate and wall parabola and repair where necessary
Install 220v service to Europe tower on overhead  THHN wire (#14) and conduit and work boxes and couplers
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Continue painting of security bars - focus on West door and laundry room    
Assess AC service capacity for A/C Amprobe
Repair or replace lawn mower Carburetor 
Scrape and paint US/JA sections 2, 1 Paint, brushes, gloves
Scrape and paint Europe sections 5, 4, 3 Paint, brushes, gloves
Scrape and paint US/JA sections 8, 7 Paint, brushes, gloves
Scrape and paint Europe sections 2, 1 Paint, brushes, gloves
Finish epoxy and paint on entry gate Paint, brushes, gloves
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Clean up concrete mix area
Connect pipe fittings and clamps for south facade drain Fittings and clamps
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Order one or two new beds for West bedroom Beds
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws
Can of new coating for test use
Repaint all blue trim
Fabricate plywood box cover for new gate opener
Do test install of AVG
Bring fist sized coral pieces for Liz
Paint the new roof drain piping
Modify roof downspout with 45 degree fittings and clamps
Replant palm tree box

October/November 2007

Project Need to Take On Hand or Buy Locally
After CQWW CW contest, lower top 10 yagi and take down US/JA 15 and 20 yagis    
Rebuild US/JA 20 yagi and reinstall all    
Install sprinkler system for sunroom lawn Complete new system 1/2 inch pipe, 8 lengths 6 meters each
Install radial extensions with irrigation system   More # 14 Cu
Repaint wall   Paint
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Test radials in area of new gate and repair where necessary
Install 220v service to Europe tower on overhead  THHN wire (#14) and conduit and work boxes and couplers
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Continue painting of security bars - focus on West door and laundry room    
Assess AC service capacity for A/C Amprobe
Repair or replace lawn mower
Obtain new string trimmer
Scrape and paint US/JA sections 3, 5, 6 Paint, brushes, gloves
Scrape and paint US/JA sections 8, 7 Paint, brushes, gloves
Scrape and paint Europe sections 4, 3, 2 Paint, brushes, gloves
Sand entry gate and re-stain and re-paint Sander, Benjamin Moore varnish
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Load new dishes into kitchen - dispose of old ones Three sets new dishes
Meet with Ribert about installing tile and finishing step closet, especially floor Grates Cement and sand, 2 
Clean up concrete mix area
Connect roof terrace drains to stop south facade dripping Fittings and pipe
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Order one or two new beds for West bedroom Beds
Re-stow FT-1000 (4) in closet FT-1000 (4) and case
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws

 

September 2007

Project Need to Take On Hand or Buy Locally
After contest, lower top 10 yagi and take down US/JA 15 and 20 yagis    
Rebuild US/JA 20 yagi    
Install sprinkler system for sunroom lawn Complete new system 1/2 inch pipe, 8 lengths 6 meters each
Install radial extensions with irrigation system   More # 14 Cu
Repaint wall   Paint
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Apply for all PJ2T licenses for the year Completed forms 
Harvest samples of hardline for W8WTS
Apply for John Laney PJ4A CQWW CW license  Completed forms (clipboard)
Pick up lounges from Karnak Cash
Pay 2005 tax assessment Form and cash
Sniff out noise source W8TK MFJ sniffer
Weatherproof entry gate components Epoxy primer and paint
Test radials in area of new gate and repair where necessary
Install 220v service to wall  THHN wire (#14) and conduit and work boxes and couplers
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Continue painting of security bars - focus on West door and laundry room    
Install standard-wired CW keying cable sets W8TK cables and adapters (4 sets)
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire (W1MD), 6 - 6700 Philly dead ends
Connectorize StackMatch boxes for quick swapout Lightweight DC power wire Jones plugs/sockets
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Load new dishes into kitchen - dispose of old ones Three sets new dishes
Meet with Ribert about installing tile and finishing step closet, especially floor Grates Cement
Connect roof terrace drains to stop south facade dripping Fittings and pipe
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Order one or two new beds for West bedroom Beds
Re-stow FT-1000 (4) in closet FT-1000 (4) and case
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws
Retrieve one surplus wireless router
Paint Europe tower, with coordination with Herko, down to 20 foot level. Make arrangements to have cash to pay Herko; Gloves Paint

July 2007 

Project Need to Take On Hand or Buy Locally
Before contest, lower top 10 yagi and take down US/JA 15 yagi    
Rebuild US/JA 15 yagi 10 element to plate DX Engineering saddles  
After contest, lower top 10 yagi and take down US/JA 20 yagi    
Rebuild US/JA 20 yagi    
Install new shower control in East bathroom Control and kit  
Install sprinkler system for sunroom lawn Complete new system 1/2 inch pipe, 8 lengths
Test inflatable Queen bed and install in West bedroom closet Bed  
Install radial extensions with irrigation system   More # 14 Cu
Repaint wall   Paint
Arrange with Ribert to prep coat the patio Grates  
Pay TDS through September    
Pay Zoom  July - August    
Pay for license for LY4F Paperwork -- on clipboard  
Fully assess Heliax on back porch    
Troubleshoot Internet switch and install replacement New 3 Com switch  
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Continue painting of security bars - focus on West door and laundry room    
Continue replacement of the last six guy wire tails and assemblies 2 - 4000 dead ends for WARC, 6 1/4" EHS, 150 ft 1/4 " EHS guy wire, 6 - 6700 Philly dead ends
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Load new dishes into kitchen - dispose of old ones Three sets new dishes
Stow four new Compaq power supplies in East closet Four NW0L power supplies
Meet with Ribert about installing tile and finishing step closet, especially floor Cement
Make contact with front gate opener contractor Cribal Automatismos N.V.
Schonegevelstraat no. 72
869.2472
Mr. Ballentine 868.9816 July 8
Locate garage plans and adapt design to new objective Plans from Ohio
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Stamp books that are to remain on the island with new rubber stamp Rubber stamp, custom
Order Karnak furniture immediately on arrival
Order one or two new beds for West bedroom Beds
Install and test Titan II Titan II RF deck
Re-stow FT-1000 (4) in closet FT-1000 (4) and case
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws
Paint Europe tower, with coordination with Herko, down to 20 foot level.  Make arrangements to have cash to pay Herko; Gloves Paint
Replace East bathroom shower control Valve kit and all repair parts and fittings
File CCC licenses License copies
Test new rechargeable batteries in solar lights  Green AA batteries
Paint bad spots on US/JA tower, starting from top and working down -- save complete recoating for November   Paint
Repair PJ2MI rotor Repair kit and specialized adapter cable

February - April 2007

Project Need to Take On Hand or Buy Locally
Install four new wheels on lawn mower   Wheels
Install side mount for US/JA 20 yagi   Hardware kit
Replace all wind truss hardware and weatherproof for US/JA tower   Kit - complete 
Install, test, and catalog repaired FT-1000MP brought by N1ZZ N1ZZ: FT-1000MP (1) SN 8J330156  
After contest, lower top 10 yagi and take down US/JA 15 yagi    
Rebuild US/JA 15 yagi    
After contest, lower top 10 yagi and take down US/JA 20 yagi    
Rebuild US/JA 20 yagi    
Make file for CCC member licenses Copies of licenses  
Replace guy tail and weatherproof on guy wires as per master plan Additional dead ends  
Update web site with new Radio Closet contents and boxes    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Remove picture window security bars and recoat    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install high 80 meter dipole in prototype    
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws
Bring planter dirt up to finish level    
Prototype installation of lawn sprinkler system All parts except tubing  
Install TV line to East room   Coax

 

November - December 2006

Project Need to Take On Hand or Buy Locally
Install four new wheels on lawn mower   Wheels
Research front end protectors or ICE filters    
Install Tardis time server on all machines    
Install side mount for US/JA 20 yagi   Hardware kit
Rehab Europe 15 yagi   Rebuild and truss kits
Replace all wind truss hardware and weatherproof for US/JA tower   Kit - complete 
Install new vertical overhead truss supports on US/JA 20 and 15 yagis   Rebuild and truss kits
Scrape and paint 70 - 50 on Europe tower   Paint and brushes
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem   Traps
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated    Set of 8 new HV electrolytics
Test, catalog, then store new FT-1000 Mark V FT-1000 (6) Mark V from W8TK  
Remove picture window security bars and recoat    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install high 80 meter dipole in prototype    
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Install outdoor shower at new wall   Moen shower fixture and adapters for PVC connection
Finish paint on roof terrace and addition   Off white and brushes
Hang Erickson painting in East Sunroom Framed painting  
Rehab entire roof - anchor screws   Black tar roof sealant
Bucket of galvanized anchor screws
Bring planter dirt up to finish level    
Prototype installation of lawn sprinkler system All parts except tubing  
Install telephone line to East room   Coax
Install TV line to East room   Coax
Rough install irrigation lines to new planters   Tubing, fittings
Identify and reconnect all construction-related radials    
Install new wireless router Router  
Resnake sewer line    
Troubleshoot PC17    
Repair wireless access in sunroom    
Seal grout in sunroom   TilePro grout sealer

September 2006

Project Need to Take On Hand or Buy Locally
Install four new wheels on lawn mower   Wheels
Apply for PJ2T callsigns for 2006-2007 events Application forms, cash  
Renew PJ2DX for another year Application form  
Pay homeowner's insurance premium E-mail, cash  
Pay CY 2003 real estate tax Bill, cash  
Install side mounts for Europe 10, 15 yagis Hardware kit  
Install side mount for US/JA 20 yagi Hardware kit  
Take down Europe 10, 15 yagis    
Rehab Europe 10, 15 yagis    
Replace all wind truss hardware and weatherproof for Europe tower    
Replace all wind truss hardware and weatherproof for US/JA tower    
Replace bottom US/JA tower ocean guy tail and dead ends    
Install new vertical overhead truss supports on US/JA 20 and 15 yagis    
Replace deadend on WARC tower, ocean end    
Scrape and paint top 50 feet of Europe tower    
Test TB-3 on Europe tower for loosenability    
Add missing cover plates in East sunroom    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem Traps  
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated  Set of 8 new HV electrolytics  
Test, catalog, then store new FT-1000 Mark V FT-1000 Mark V from W8TK  
Continue recoating of East security bars    
Remove picture window security bars and recoat    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install high 80 meter dipole in prototype    
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Install outdoor shower at new wall Moen shower fixture and adapters for PVC connection  
Rehab entire roof - anchor screws Bucket of galvanized anchor screws Black tar roof sealant
Bring planter dirt up to finish level    
Prototype installation of lawn sprinkler system All parts except tubing  
Install telephone line to East room   Coax
Install TV line to East room   Coax
Rough install irrigation lines to new planters   Tubing, fittings
Install new wireless router Linksys router  
Install new phone in East Sunroom  GE phone  
Resnake sewer line Snake bits  
Pour floor in step closet    
Troubleshoot PC17    
Fix wireless access in sunroom Replacement wireless card  
Identify and reconnect all construction-related radials    

 

June-July 2006

Project Need to Take On Hand or Buy Locally
Install four new wheels on lawn mower    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem Traps  
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated  Set of 8 new HV electrolytics  
Test, catalog, then store new FT-1000 Mark V FT-1000 Mark V from W8TK  
Store power transformer for Titan III Power transformer for Titan III  
Continue recoating of East security bars    
Remove picture window security bars and recoat    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install new boom-to-mast clamp on Europe 10 yagi New clamp and new hardware  
Perform full inspection of all three towers    
Make complete list of hardware and parts needed for takedown and rehab cycle on yagis    
Install high 80 meter dipole in prototype    
Repaint US/JA tower as necessary   Two component paint and brushes
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Connect East room water lines to sources at utility room New soldering torch. Copper and PVC fittings all available on island.
Install outdoor shower at new wall Moen shower fixture and adapters for PVC connection  
Coat all new concrete with sealer   Benjamin Moore sealer
Apply all exterior paint   5 gallon buckets of Comotex (Off White)
Install flooring in East room   Marble tile
Install two ceiling fans and lights #14 stranded THHN  Fans and conduit and work boxes, switches, cover plate
Rehab entire roof - anchor screws Bucket of galvanized anchor screws Black tar roof sealant
Install light lenses on five wall lights Correct hex head screws  
Bring planter dirt up to finish level    
Coat all new exterior boxes and fixtures with epoxy paint   Epoxy
Prototype installation of lawn sprinkler system All parts except tubing  
Install step-down transformer at East room entry panel   Transformer: Goisco
Install telephone line to East room   Coax
Install TV line to East room   Coax
Rough install irrigation lines to new planters   Tubing, fittings
Finish downspout installation in planter bed   3 inch PVC tubing and fittings
Identify and reconnect all construction-related radials    

 

 

February-April 2006

Project Need to Take On Hand or Buy Locally
Install new power supplies into bad Compaq desktop systems Six new power supplies  
Assess the problems with any remaining bad computers    
Install four new wheels on lawn mower    
Try installing new CL-33 driven element traps to test for improvement of 10 meter SSB problem Traps  
Troubleshoot hum problem on Titan 425 and install new electrolytics if indicated  Set of 8 new HV electrolytics  
Continue recoating of East security bars    
Apply for license for WA4PGM Paperwork  
Remove picture window security bars and recoat    
Bury more 160 radials    
Deliver HT to PJ2JW HT  
Make temporary 160 radials at north end of yard permanent    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install new boom-to-mast clamp on Europe 10 yagi New clamp and new hardware  
Store backup board and parts for Moose MPI-50 security unit    
Perform full inspection of all three towers    
Make complete list of hardware and parts needed for takedown and rehab cycle on yagis    
Install high 80 meter dipole in prototype    
Initiate construction of sunroom Blueprints  
Repaint US/JA tower as necessary   Two component paint and brushes
Install 80 meter ocean wire vertical in prototype    
Repaint West bedroom with semi-gloss paint    
Make TV cabling permanent to three rooms and pavilion    
Attempt repair of Astron RS-50   W8TK expert repair kit
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Assess relay problem with Alpha linear    
Upgrade WL to 10.57    
Replace 40 yagi rotor    
Replace fans in 3Com switch Fans  

 

October-November 2005

Project Need to Take On Hand or Buy Locally
Install entrance panel for pennant antennas Panel, DC power wire, hardware  
Complete assembly of StackMatch specialized expert test kit, then troubleshoot bad StackMatch StackMatches (2), control panel, test cable, dummy loads, documentation  
Install all software on PC9 and PC10 and store PC9 and PC10  
Perform power supply swap test of bad Compaq desktop systems    
Install four new wheels on lawn mower Wheels  
Troubleshoot CL-33 and install new driven element traps if indicated Traps  
Paint Europe tower from 30 foot point up Sandpaper - 3M "Sandblaster" Epoxy paint
Install and test Titan I RF deck  Titan I and documentation  
Continue recoating of East security bars    
Remove picture window security bars and recoat    
Bury more 160 radials    
Seal the rest of the plywood in shelter roof   Varnish
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install updated Norton Antivirus New product CD  
Install new boom-to-mast clamp on US/JA 20 yagi New clamp from W8AV
New hardware
 
Install new knob on Centaur band switch and give to VERONA New knob  
Store backup board and parts for Moose MPI-50 security unit    
Make satellite TV operational    
Transport and place FT-1000 # 2 into service FT-1000 # 2  
Paint soffit undersides   Brilliant white paint
Replace rotor cable to WARC    Belden 8 conductor cable - 250 feet
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
     

 


 

September 2 - 14 2005

Project Need to Take On Hand or Buy Locally
Troubleshoot "A" port on # 3 FT-1000MP   Pencil iron and solder sucker - follow W6XA advice
Paint Europe tower from 30 foot point up Sandpaper - 3M "Sandblaster" Epoxy paint
Repair 30 meter inv vee   Wire and rope
Install entire RX antenna switching system RAS 8 x 2, four splitters, all needed cables, connectors, adapters, documentation, schematics  
Install and test Titan I RF deck  Titan I   
Continue recoating of East security bars    
Remove picture window security bars and recoat    
Bury more 160 radials    
Seal the rest of the plywood in shelter roof   Varnish
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Install two additional roofing filters Filters  
Perform total functionality test of all four stations and computers    
Install updated Writelog version  PJ2T Standard CD  
Install updated Norton Antivirus New product CD  
Install new boom-to-mast clamp on US/JA 20 yagi New clamp from W8AV
New hardware
 
Store new FT-1000 HPF board in radio closet HPF board  
Store two 4CX1600B tubes 4CX1600B tubes  
Get coax switch to PJ2GT Daiwa switch  
Replace locking chain for glass top table with combination chain New chain  
Install and test WinKeys Four WinKeys, interface cables  
Store new wheels, carburetor kit, and start cord for MTD mower Parts on order   
Install new knob on Centaur band switch and give to VERONA New knob  
Store backup board and parts for Moose MPI-50 security unit    
Replace CB male--male PL-259 adapters at Station # 3 with Amphenol adapters Two Amphenol adapters  
Hang new contest plaques Two plaques  
Make satellite TV operational    
Renew homeowner's insurance   100170897, 100170896, 100170895
Apply for seven callsign permissions Paperwork filled out  
Repair dead telephone line    
Transport and place FT-1000 # 2 into service FT-1000 # 2  
Assess condition of all outside station components and generate prioritized work list    
Paint soffit undersides   Brilliant white paint
Replace rotor cable to WARC    Belden 8 conductor cable - 250 feet
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Buy and install light fixture over sink   Locally available light fixture

 

January - April 2005

Project Need to Take On Hand or Buy Locally
Repair failed tiles in West bathroom shower Grout and mastic Additional tiles from SWBR
Troubleshoot "A" port on # 3 FT-1000MP    
Remove coax tapes on US tower, entire tower, paint, and reattach and weatherproof Scotch 33  
Paint US 20 boom truss vertical L-channels.    
Scrape and paint US/JA tower Wire brush, brushes Epoxy paint
Continue recoating of East security bars    
Apply for special callsign for seven contests Cash NAfl 770 and all application paperwork  
Renew PJ2DX local callsign Application paperwork  
Paint soffit undersides   Brilliant white paint
Shoot more photos for PJ2DX QSL    
Replace rotor cable to WARC  Belden 8 conductor cable - 250 feet  
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Seal the rest of the plywood in shelter roof   Varnish
Install TBS cable and distribution amp permanently    
Fix clearance problem on wall man-gate    
Replace coax to 160 Inv L   Coax
Plant citrus trees in back yard    
Install post lights on pillars at street Bulkhead light fixtures Small fluorescent bulbs
Buy and install light fixture over sink   Locally available light fixture

October 2004

Project Need to Take On Hand or Buy Locally
Repair last 16 failed tiles in west bathroom shower Grout Additional tiles from SWBR
Replace stucco plaster on house corners damaged by construction    
Install post lights on pillars at street Bulkhead light fixtures Small fluorescent bulbs
Buy and install light fixture over sink   Locally available light fixture
Install and test M/2 interlock system Entire system  
Repair Europe Beverage    
Troubleshoot "A" port on # 3 FT-1000MP    
Permanently install coax stubs and document    
Final install of WL audio lines, boxes, and connector adapters    
Make, test, and label subreceiver pigtails for headphones    
Repair 160 Inv L high SWR problem    
Install and test new shielded audio cables for SSB Rebuilt cables  
Replace and weatherproof rusted wire clips on US 20 boom lateral braces
1/8 inch wire clips, galvanized Duct seal
Replace and weatherize rusted clips on all 8 boom truss attachments in the air.
1/8 inch wire clips, galvanized Duct seal
Replace tie wraps on TA-33 balun
   
Remove coax tapes on US tower, entire tower, paint, and reattach and weatherproof
Scotch 33  
Paint US 20 boom truss vertical L-channels.
   
Duct seal all wire clips on 15 US yagi boom laterals

  Duct seal
Install new ceiling fans in both bathrooms   Fans
Install tree lighting system   All components and bulbs from Home Depot, flexible conduit and fittings
Shoot more photos for PJ2DX QSL    
Troubleshoot WARC rotor to isolate source of jittery direction indication during rotation    
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Seal the rest of the plywood in shelter roof   Varnish
Replace mirror in east bedroom Metric tape measure  

 

September 2004

Project Need to Take On Hand or Buy Locally
Repair last 16 failed tiles in west bathroom shower Grout Additional tiles from SWBR
Install new blinds in main room   Paperwork from Ackerman to get blinds installed
Install 1 x 6s on rafter tips in pavilion Galvanized nails Lumber is on hand
Obtain Norton AV rebate documents    
Replace stucco plaster on house corners damaged by construction    
Install post lights on pillars at street Bulkhead light fixtures Small fluorescent bulbs
Buy and install light fixture over sink   Locally available light fixture
Install W3NQN automatic filter system at Station # 1 Shelf brackets Filters and controller are on hand
Completely clean and reorganize radio closet   Plastic organizer boxes
Move W3NQN manual system to Station # 3 60 ft 8 conductor shielded DC wire  
Install and test M/2 interlock system Entire system  
Install and test new shielded audio cables for SSB Rebuilt cables  
Install Writelog update on all computers PJ2T Master CD (2 copies)  
Update .DAT and .CTY files on all machines.  PJ2T Master CD (2 copies)  
Confirm Fatum insurance renewal and pick up papers.     
Recable 20 meter array to be available at Stations 2 and 3.    
Replace fill valve and wall valve on East toilet.   Threaded valve and Fluidmaster kit
Troubleshoot SWR problem on 80 Europe loop    
Retune 160 Inverted L, which has drifted in frequency    
Continue painting on Europe tower, especially top section   Two component paint
Continue painting on US/JA tower, especially top section   Two component paint
Replace rusted Europe mast safety U bolt with an aluminum one
  Aluminum U bolt, 2 inch
Replace rusted hardware on 160 vee PVC support at top of Europe tower
  Huge 3 inch U-bolts
Repair failed 80 meter Europe reflector    
Replace and weatherproof rusted wire clips on US 20 boom lateral braces
1/8 inch wire clips, galvanized Duct seal
Same on Eur 20 truss wires.
1/8 inch wire clips, galvanized Duct seal
Replace and weatherize rusted clips on all 8 boom truss attachments in the air.
1/8 inch wire clips, galvanized Duct seal
Replace tie wraps on TA-33 balun
   
Remove coax tapes on US tower, entire tower, paint, and reattach and weatherproof
Scotch 33  
Paint US 20 boom truss vertical L-channels.
   
Duct seal all wire clips on 15 US yagi boom laterals

  Duct seal
Install additional solar landscaping lights Light fixtures (2)  
Install new ceiling fans in both bathrooms   Fans
Install new table fans for all stations Fans (5)  
Install tree lighting system   All components and bulbs from Home Depot, flexible conduit and fittings
Replace four center insulators on Cush Craft 10 meter yagis   Lexan rods
Clean and weatherproof all exposed hardware on US/JA 10 meter yagis   Duct seal, Scotch 33
Reinstall 10 stack with new stacking cables at wider spacing   Coax cables are on hand on th e island
Troubleshoot and repair automatic band switching at Station #1 Top Ten box    
Shoot more photos for PJ2DX QSL    
Troubleshoot WARC rotor to isolate source of jittery direction indication during rotation    
Repair and reinstall 2 meter Ringo Ranger broken radial   Rethreaded rod
Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Inspect Europe Beverage, entire length    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Update Norton Antivirus definitions on all machines   New Norton AV software
Seal the rest of the plywood in shelter roof   Varnish
Replace mirror in east bedroom Metric tape measure  
Install all new boom truss assembly on Europe 20 yagi Prefabbed assemblies  

 

July 2004

Project Need to Take On Hand or Buy Locally
Repair failed sink wall tile in west bathroom Tile mastic, tile cutter, grout  
Install new blinds in main room Blinds  
Verify Karnak as source of patio furniture and make a purchase   Karnak furniture
Install 1 x 6s on rafter tips in pavilion   Lumber is on hand
Install new drapes in West bedroom Drapes, rods, hook/loops  
Install hammock support hardware in pavilion Chains, threaded link, concrete anchors  
Install video cameras on both porches Cameras and C batteries  
Seal pavilion posts and beams Brushes Concrete sealer
Cement tops of pavilion rail balustrade posts   Concrete and sand
Seal rail and posts   Concrete sealer
Paint all new concrete off white   Paint - Comotex
Install post lights  Bulkhead light fixtures Small fluorescent bulbs
Buy and install light fixture over sink   Locally available light fixture
Install W3NQN automatic filter system at Station # 1 Shelf brackets Filters and controller are on hand
Move W3NQN manual system to Station # 3 60 ft 8 conductor shielded DC wire  
Install tree lighting system   All components and bulbs from Home Depot, flexible conduit and fittings
Transport and test Arizona Alpha 76 linear, then put in storage Alpha 76 bought from N7BG  
Replace four center insulators on Cush Craft 10 meter yagis   Lexan rods
Shoot more photos for PJ2DX QSL    
Troubleshoot WARC rotor to isolate source of jittery direction indication during rotation    
Repair and reinstall 2 meter Ringo Ranger broken radial   Threaded rod
Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Update Norton Antivirus definitions on all machines   CD
Revarnish gates   Polyurethane varnish
Seal plywood in shelter roof    
Seal and paint new concrete in shelter    
Install drapes and rod in West bedroom Drapes, rods  
Replace mirror in east bedroom    
Inspect Europe yagi, full length    

 

 


February 2004

Project Need to Take On Hand or Buy Locally
Shoot more photos for PJ2DX QSL    
Shoot updated calendar photos of the stations and from the towers    
Reinstall Europe Beverage feedline with conduit, hidden Conduit  
Troubleshoot WARC rotor to isolate source of jittery direction indication during rotation    
Electrical installation in ocean shelter Many electrical components  
Repair and reinstall 2 meter Ringo Ranger broken radial   Threaded rod
Inspect, clean, lubricate, and coat guy anchors, equalizer plates, and turnbuckles where needed      
Get a printer functioning W0CG Canon BCJ-4200 and ink and software   
Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Update Norton Antivirus definitions on all machines    
Seal plywood in shelter roof    
Seal and paint new concrete in shelter    
Lubricate and re-label all locks    
Continue scraping east porch security bars    
Repair mirror in east bedroom    
Replace shower head in east bathroom    
Inspect Europe yagi, full length    
Splint the bad leg on the WARC tower and clean up the oxidation problems at the rotor plate    

 


November 2003

Project Need to Take On Hand or Buy Locally
Tune parasitic elements on 80 loop for CW and install tuning stubs Roll of # 14 blue solid Cu MFJ analyzer, knife switches
Swap in a new rotor on the WARC tower     Rotor donated in Columbus -- rehabbed by CATS  
Add a quick-disconnect pigtail for the WARC tower rotor   Male and female quick disconnects from CATS
Add switch to get both Bevs to Station # 3   MFJ switch, coax adapters, coax.
Mark presets for LK-800    
Attempt to replace potentiometer in old WARC rotor -- if unsuccessful, return it to the States    Potentiometer from K8ND is at QTH
Stash cks and a backup credit card in a safety deposit box    
Shoot more photos for PJ2DX QSL    
Shoot updated photos of the stations and from the towers    
Put CCC Rotor 4 in storage Rehabbed repaired rotor from CATS   
Repair and reinstall 2 meter Ringo Ranger broken radial   Threaded rod
Inspect, clean, lubricate, and coat guy anchors, equalizer plates, and turnbuckles where needed      
Label all six rotors      
Get a printer functioning W0CG Canon BCJ-4200 and ink and software   
Scrape, prime, and coat two sections on US/JA tower and one on Eur tower  

Brushes

Bury more 160 radials      
Begin installation of PJ2 PacketCluster    
Connectorize StackMatch boxes for quick swapout   Jones plugs/sockets
Update Norton Antivirus definitions on all machines    
Install automatic switching panel and filters at Station #2 Filter panel assembly and filters   
Finish design of patio project Drawings and photos  

 


September 2003

Project Need to Take On Hand or Buy Locally
Retune the 80 Europe delta loop beam for 3750 and remove the tuning stubs at the bottom and replace with poly at the corners W8AV poly twinlead MFJ analyzer
Make a second set of poly tuning stubs for the 80 delta loop to make a quick change to 3530.     Knife switches and stainless hardware
Swap in a new rotor on the WARC tower   Rotor donated in Columbus -- rehabbed by CATS   
Add a quick-disconnect pigtail for the WARC tower rotor Male and female quick disconnects from CATS   
Replace bad tiewraps with tape on all overhead messengers   Scotch 33
Put labels on Alpha 78 Preprinted labels  
Attempt to replace potentiometer in old WARC rotor -- if unsuccessful, return it to the States    Potentiometer from K8ND is at QTH
Shoot photos for PJ2DX QSL    
Shoot updated photos of the stations and from the towers    
Hang recent article displays, framed and matted (CQ and QST) Frame and mat reductions   
Put the new T2X rotor in storage Rehabbed repaired rotor from W9JUV   
Install three rotor boxes with brake delay mods  Three rotor boxes from N8NR; preprinted labels   
Bring back three rotor boxes for N8NR replacements      
Move 2 meter radio to Station # 4 9913 class coax - 60 ft    
Repair and reinstall 2 meter Ringo Ranger, fully weatherproofed Parts from W8TK Ringo    
Label coax stub kit and pre-connect all needed coax tees and adapters Female tees and male-male adapters (6); labels, preprinted Clear tape
Inspect Europe Beverage and repair any damage      
Replace threaded toilet shutoff valve in East bathroom (It's leaking) Replacement valve and washer set
Inspect, clean, lubricate, and coat guy anchors, equalizer plates, and turnbuckles where needed      
Stock backup tubes for Titan II and LK-800 in radio closet GU-91B, 3CX800A7
Corrosion-proof salt-exposed guy anchor parts with duct seal and tape Duct seal, Scotch 33  ScotchKote
Label all six rotors      
Re-label rotor boxes      
Get a printer functioning W0CG Canon BCJ-4200 and ink and software   
Scrape, prime, and coat four sections on US/JA tower Take about six brushes   Need more primer and epoxy paint

 

Bury more 160 radials      
Update Writelog to current version on all machines.  New PJ2T standard software disk  
Update Norton Antivirus definitions on all machines    
Install new RigRunners and DC plugs RigRunners from N1ZZ  
Attempt to clear problem of 80 meters knocking off the phone diapup    
Install new 3CX1200A7 in the AL-1200, but leave the amp in the closet  3CX1200A7 tube     
Connect and exercise RigBlaster Pro on RTTY MMTTY documentation  
Install automatic switching panel and filters at Station #2 Filter panel assembly and filters   

 

July 2003

Project Need to Take On Hand or Buy Locally
Replace screen door piping and screens on west main door and east bedroom door Piping  
Swap in a new rotor on the US/JA tower - repaint with epoxy   Rotor on hand
Replace pot in US/JA rotor and test Potentiometer from K8ND  
Diagnose direction-indication problem in WARC rotor. Potentiometer from K8ND  
Install three rotor boxes with brake delay mods  Three rotor boxes from N8NR  
Bring back three rotor boxes for N8NR replacements    
Re-label rotor boxes    
Get a printer functioning W0CG Canon BCJ-4200 and ink and software  
Test FT-1000MP #4 and store it in backup closet FT-1000MP #4  
Scrape and prime east security bars with epoxy paint    
Repair broken cantilever rope on Europe 80 meter loop beam Phillystran and hardware to attach loops at top  
Place new 3CX800A7 and new GU-91 in radio closet storage Tubes  
Install automatic switching panel and filters at Station #2    
Move 2 meter radio to Station # 4   9913 class coax - 40 ft
Label coax stub kit and pre-connect all needed coax tees and adapters Female tees and male-male adapters (6); labels, preprinted Clear tape
Bury additional radials for 160 Inv L    
Pay property taxes Statement and adequate cash
Join CCC members into VERONA List and cash
Re-install FT-1000 Field at Station #2 FT-1000 Field
Install new light fixture over sink below cabinets Need one 50HZ light fixture Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Test Compaq desktop (PC 14) and then put it in backup storage Compaq Desktop #3
Inspect Europe Beverage and repair any damage
Inspect, clean, lubricate, and coat guy anchors, equalizer plates, and turnbuckles where needed

 

March 2003

Project Need to Take On Hand or Buy Locally
Bury feedline (RG-213) from Europe Beverage road-crossing point to station 300 ft BuryFlex RG-213  
Continue painting the Europe tower   Primer and paint are on hand at QTH
Install Beverage switching arrangement in QTH One more two position coax switch Use existing lightweight coax
Move 2 meter radio to Station # 4   9913 class coax - 40 ft
Label coax stub kit and install all needed coax tees and adapters Female tees and male-male adapters (6); labels, preprinted Clear tape
Bury additional radials for 160 Inv L    
Research property taxes Deed, copy of purchase closing invoice, contact information on Smeets Patricia van Rooyen  
Install inline filter at telephone entry point and try to isolate source of 80 and 170 interference N8BJQ K-Com filter and tech note
Install new light fixture over sink below cabinets Need one 50HZ light fixture Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Rearrange computers per NW0L recommendations Printed copy of his E-mail
Install better general room lighting over dinner table 4 foot track, connector, splice piece, switch box, wall-mount moulding.  Fixtures and bulbs are on hand in west closet
Change .INI files for Writelog and store copies on web site and on server for PJ2T Standard CD
File application with BT for IARU and drop off cy of residence permit application verification KPMG paper
Get M&C checking privileges    

 

February 2003

Project Need to Take On Hand or Buy Locally
Permanentize isolated US/JA Beverage and bury coax Direct burial RG-213 -- 250 feet  
Fix software problem (Norton) on Ethernet    
Move 2 meter radio to Station # 4   9913 class coax - 40 ft
Label coax stub kit and install all needed coax tees and adapters Female tees and male-male adapters (6); labels, preprinted Clear tape
Bury additional radials for 160 Inv L    
Lay out designs for patios and porches    
Visit Pearl N.V. to finalize insurance application    
Pay property taxes    
Install new light fixtures over sink below cabinets Need two light fixtures Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Install better general room lighting over dinner table Study and design while on site – not sure how to do this  
Complete Europe Beverage 1000 ft #14 insulated wire and Beverage transformers; heavy boots All parts on hand on Curacao
Get M&C checking privileges    

 

January 2003

Project Need to Take On Hand or Buy Locally
Replace Ethernet cables with shielded cable and route away from coax and RF sources Shielded cables, various lengths   
Install ferrites on new cables and validate connectivity of all machines on network    
Install new CD ROM in Compaq PC and test 0.5 inch form factor CD ROM drive, Compaq (bought by NW0L)  
Move 2 meter radio to Station # 4   9913 class coax - 40 ft
Finish painting of US/JA tower Wire brushes  
Begin priming of Europe tower   Primer for epoxy on galvanizing
Install new Ethernet hub and test Ethernet switch (NW0L will ship)  
Label coax stub kit and install all needed coax tees and adapters Female tees and male-male adapters (6); labels, preprinted Clear tape
Bury additional radials for 160 Inv L    
Paint CCC logo on entry wall Amy's stencil and paint kit  
Clean/plant across front of wall    
Deliver 160 meter traps to PJ2MI Traps from Tennessee  
Lay out designs for patios and porches    
Move rotor and stack boxes between Stations #1 and #2 and make them pluggable Jones plugs and sockets and aluminum panel to mount on wall; standoffs and lag shields  Rotor cable
Visit Pearl N.V. to finalize insurance application    
Pay property taxes    
Install new light fixtures over sink below cabinets Need two light fixtures Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Install better general room lighting over dinner table Study and design while on site – not sure how to do this  
Put new plywood in bottom of love seat, or tack down what is there now    
Complete Europe Beverage All parts on hand on Curacao
Install outdoor shower   All parts on hand
Recable to make M/2 easier at Station # 2 Design needed, and possibly one or two switches  
Assist Brett on Verona PacketCluster system    
Initiate residence permit process    
Get M&C checking privileges    
Get "replace with spare part" numbers for all Compaq components.    
Buy CCC bicycle and secure it Security chain  

November 2002

Project Need to Take On Hand or Buy Locally
Raise top US/JA 15 meter monobander MFJ-259B  
Repair Titan II Parts as specified by W4PA  
Repair LK-800 Take 12 V and 24 V relays to wire around QSK board  
Make duplicate copies of manuals: Titan II, Centaur, Alpha 86, Alpha 87    
Install Piexx board in W8TK TS-940 Board (on hand at W0CG)  
Bring home RCS-4 for KU8E    
Re-route Ethernet cables out of coax bundles and add ferrites    
Replace toilet in West bathroom Wax rings  
Set up Writelog keying at all stations (Station #1 may require special cabling) Cabling diagrams and designs for Station #1 and software notes for Writelog.ini  
Research how to install W5XT multikeyer Cable designs and installation notes  
Install and debug Writelog networking Notes from testing at W0CG -- on PJ2T standard CD   
Locate source of telephone interference and minimize it    
Remove 160 inv vee -- store it on west bedroom shelf    
Paint rest of US/JA tower and hit upwind spots on Eur tower Paint can caddy, more mitts, brush caddy (fabricate this), gloves  
Deliver cable and book and Caltrate to PJ2MI 70 ft 9913 and connector on one end only  
Re-install 160 meter Inv L to top of Europe tower   Radials and hardware.
Assess KN7Y yagi as a possible bottom 15 yagi and bring back dimensions to support modeling    
Attempt to configure station for M/M Extensive list -- coordinated with team by E-mail  
Arrange to have blocks welded on the security gates   Contact Kenneth Ferbius
Visit Pearl N.V. to finalize insurance application    
Get a resolution on the TV and Internet problem    
Pay property taxes    
Install new light fixtures over sink below cabinets Need two light fixtures Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Install better general room lighting over dinner table Study and design while on site – not sure how to do this  
Finalize ground system wiring for US/JA beverage   Parts all on hand
Install W9XT card in computer at main station and get it talking to WriteLog N8BJQ project  
Repair logikeyer and put it in service at Station # 4    
Put in new LPT1 extender for Top Ten box and test it Cable and gender changer needed  
Try RTTY program at Station # 1 and see if I can copy RTTY and PSK31    
Test packet system on 2 meter FM    
Ground 2 meter FM radio and move away from AL-1200    
Install rapid tune mechanism for 80 loop Need one more knife switch  
Put new plywood in bottom of love seat, or tack down what is there now    
Modify filter panel for "through" while off   Relays on hand
Connect filter panel so it can slave to the Top Ten box band changes   Improvise with what is on hand – make the tracking function switchable in or out
Install outdoor shower Shower, pre-made fittings, more Cu tubing, two valves.  
Install the HF-2V as well as feedline to it   All on hand
Install DSP on Station # 1 radio.   Fabricate cables while on island.

September 2002

Project Need to Take On Hand or Buy Locally
Diagnose and correct as much of the TVI and RFI problems as possible K-Com telephone filters

Ferrite cores to make common mode rejection filters

AC line filters

Two Bencher YA-1 low-pass filters

W8TK ARRL RFI book

Bag of small ferrites from Hosfelt

Assistance will be available from PJ2BR
Build 15 meter top US/JA yagi Validated design (K6STI) and all design notes from W8AV

Borrowed MFJ meter from N8LGP

Tube of Penetrox

Buy all new element clips (30 each)

Build 15 meter bottom US/JA yagi Validated design based on Hy-Gain yagi donated by KN7Y

155-BAS manual

204-BAS manual

Install as much as possible of full SO2R configuration at Station # 1 Components list awaiting design

Full design diagrams

Move LK-800 to second table to make room on Table 3 for Station # 4
Replace parasitic suppressor in AL-1200 Goose will order two from Ameritron - Aug 2002
Install and test full Station # 4 on Table 3 (Alpha 76 and TS-940) Alpha 76

K3TUP TS-940 (repaired)

Replace bad MODEM in CCC Pentium PCI bus MODEM
CCC membership polled 19 Aug 2002 - NW0L has one
Reload all software on bad Pentium Windows 98 disk, Writelog disk, all directions
Troubleshoot computer network and try to get Writelog networked on all computers for CQWW CW Writelog disks and directions
Purchase 5 KW generator Pre-fabricated Romex cord - 110

Pre-fabricated Romex cord - 220, with female receptacle box on one end

All various possible 220 volt male plugs to connect to generator

Security chain and lock

Gasoline can
Arrange to have blocks welded on the security gates Contact Kenneth Ferbius
Visit Pearl N.V. to finalize insurance application
Pay property taxes
Visit permits agent to begin residence permit process Myra Massar myra.massar@kpmg.an 463-6259
Troubleshoot lock mechanism on the security gates
All unfinished projects from the March 14 - April 2 list in table below
Install repaired K8NZ linear and test on the air Goose needs to complete the repair
Make an updated inventory list of Radio Closet Items
Make an updated inventory list of station items, including keyers and levers and Boomsets and get serial numbers
Shoot complete set of new digital photos for the web site and for the calendar W0CG digital camera and accessories
Assess CW and computer interface situation on all radios and make a needed items list for next trip
Retrieve T-2X rotator manuals from PJ2MI
Complete Europe Beverage All parts on hand on Curacao
Obtain serial numbers for all equipment
Configure Omni VI station Order Heil AD-1-T 4 pin adapter cord for Ten-Tec
Get dual female phono plugs to adapt for paddle
Need Bencher paddle
Need Heil foot switch

Make serial cable: 10 ft three conductor shielded, male DB-25, female DB-9
Order good surge protected outlet strip for back porch station
Make a coax jumper from back porch to 160 meter vee at bulkhead and a light weight one for Beverage
Be sure there is a spare LPT1 keying adapter on the island
Retrieve keyer for Chris Parnell
Test Ekno Access 0018-886-467-702

 

March 14 - April 2 2002

Project Need to Take On Hand or Buy Locally
Fabricate 15 meter yagi Borrow MFJ meter from N8LGP

Buy tube of Penetrox

All parts, including gamma match
Raise 15 meter yagi All parts on hand
Fix 10 meter box Diagnostic procedure and circuit diagrams Relays and diodes
Start painting 80 foot tower from top down until all marine paint is gone Paint can with lid and belt loop with a brush and mitt caddy
Extend irrigation system Tees and ells for the tubing sizes brought back on last trip
Assess all water usage: irrigate, shower, flush, wash dishes, load of wash
Replace kitchen sink faucet Faucet set, 8 in on center, with spray

Plumber’s putty

Remove garbage disposal and install new sink basket and piping Sink basket and connection kits
Install secure light fixture over the utility room door and put in fluorescent Light fixture and fluor bulb 5 watt
Install new light fixtures over sink below cabinets Need two light fixtures Surface stick ducting is still on island; 50 Hz ballast is on hand at house.
Install better general room lighting over dinner table Study and design while on site – not sure how to do this
Paint entire exterior Enamel for trim

White Moorgard for overhangs and porch ceilings

Blue to mix trim color

Photos for guidance

All paint on hand
Clean up rock mess on east side of ocean wall Labor
Shovel out gravel in bed behind west bedroom Labor
Utility room rehab Silicone caulk

Shelving

Drywall mud

White paint

Shelf brackets

Install water heater All parts on hand
Start priming of concrete wall Primer paint from Europaints
Order standard cover property insurance Take letters and quote
Experiment with phone – see what is possible Take phone company guide sheet
Turn in electric meter reading Ask Brett to make up translation sheet
Install porch lights Take four each wall fixtures for low wattage fluorescents, four metal work boxes, four exterior switches and cover plates, two motion sensor units. Fixtures must enclose the bulbs so they are hard to steal

Look for heavy plastic conduit

Rake up gravel in yard, especially by the west porch Labor
Clean up driveway entryway Labor
Rake down dirt across front and transplant some cactus and decorative plants Labor
Backfill rest of the wall ditch where Ransel did not finish Labor
Fill obvious gaps in roof at ridge Roofing cement
Get WriteLog working on all three computers with Telnet spots incoming Writelog manual
Design network and get IC-765 under computer control
Make linear PTT adapter line to come out of TK TS-940 and install it Plugs on hand in the red plastic box
Reorganize the plumbing and electrical kits in the radio closet
Clean up fan wiring for the main room fans Duct is on hand
Replace DSS moulding with white color above TV
Install Eur beverage
Finalize ground system wiring for US/JA beverage Parts all on hand
Install W9XT card in computer at main station and get it talking to WriteLog N8BJQ project
Troubleshoot printing problem
Try CT network again with all computers in loop
Repair logikeyer and put it in service at Station # 4
Install Atomic clock
Replace battery in irrigation system 9 volt batteries
Repair sliding door screens Bead material needed
Replace battery in motion sensor light and test it 9 volt batteries
Put in new LPT1 extender for Top Ten box and test it Cable and gender changer needed
Try RTTY program at Station # 1 and see if I can copy RTTY and PSK31
Test packet system on 2 meter FM
Ground 2 meter FM radio and move away from AL-1200
Install tune up guide for Titan II and replace all hand written labels Preprinted labels and guides

Clear package tape

Stop at Mitsubishi Motors and discuss vehicle ownership
Install rapid tune mechanism for 80 loop Need one more knife switch
Install corner post for director of 80 loop
Clean gravel and sand pile out of back yard Labor
Put new plywood in bottom of love seat, or tack down what is there now
Throw out trash in front of yard and rake clean
Modify filter panel for "through" while off Relays on hand
Connect filter panel so it can slave to the Top Ten box band changes Improvise with what is on hand – make the tracking function switchable in or out
Test power supply for IBM Pentium and take a replacement if it is bad
Install the HF-2V as well as feedline to it All on hand
Try to isolate the nighttime noise source W8TK AM receiver and direction finder
Install DSP on Station # 1 radio. Fabricate cables while on island.
Characterize problem with 6 meter radio using freq counter and make an explanatory placard
Send Korra add’l keys for blue, radio closet
Hide a new key to the ocean gate – 10 meter boom
Do triage repair to tile in west bathroom Glue on hand
Put new outlets in the four porch receptacle boxes Receptacles on hand
Replace screen in west door Beading material on hand to take down
Assess problem with BJQ Toshiba and possibly bring back to US
Install new motherboard in DMI 486 minitower Need to cannibalize 486 motherboard from DMI at home
Install good power supply in IBM Pentium and further assess its failure -- possibly take to PJ2BR for diagnosis Good power supply from W0CG

 

February 11 - 26 2002

Project Need to Take On Hand or Buy Locally
Install crystal filter and computer board in Zilko TS-940 Board and filter - Goose will do this  
Move Zilko 940 to Station # 1 and connect it to PC COM port. Serial cable and adapters  
Reinstall shielded LPT1 keying line to Station # 1   All is on hand
Install longer LPT1 cable to Top Ten box LPT cable and adapters - CG will take  
Put up 160 inv vee on 100 foot tower All antenna components + barrels (Goose) Coax, in pieces
Put new filament transformer and fan in AL-1200 Xfmr and fan  
Bury permanent RG-213 to 80 loop   All on hand
More inv L radials and bury existing through wall   All on hand
Add more ferrites throughout station CG will take  
Add muffin fans to linears CG will take Power cords to be fabricated on island
Install 75 vee Daiwa at Station # 1 CG has + Goose has PL-259s  
Make 40 yagi available at Station # 2 in place of HF-2V   All is on hand
Modify filter panel for through when off CG has parts  
Install workaround on TK 940 so it will key an amp   Improvise with parts on hand on island
Install Bev box at Station 1 CG fabricated the boxes and will take  
Install all new cabinet screws in AL-1200 CG has and will take  
Set up 80 loop for easy switching to 75 Need knife switches still  
Start tower painting with the two component paint   Paint is on hand
Install old version of WintelnetX on all Pentium PCs CG will bring diskette and also FTP to his site  
Install new ink cartridge in printer and test   Cartridge is on hand
Assess tile repair in west bathroom    
Install permanent hose connections to irrigation system CG has all parts  
Install new water heater   All parts on hand
Install water filter   All parts on hand
Install new shower heads CG has fixtures and teflon tape  
Install 14 new outlets and switches with cover plates CG has all parts  
Start painting of wall - primer   Purchase on the island
Clean up construction mess, connect radials, and backfill   Tools on island
Buy a string trimmer and secure it    
Look for noise source TK is bringing portable RX to CG on Sunday  
Install new photocells on outdoor lights CG has parts  

 

September 20 - October 2 2001

Project Need to Take On Hand or Buy Locally
Install beam boom wind guys on Europe 20 yagi Kit: boom bracket and U bolts and pipe strap, Phillystran, deadends, thimbles, turnbuckle and clips, shackle  
Install beam boom wind guys on Europe 15 yagi Kit: boom bracket and U bolts and pipe strap, Phillystran, thimbles, turnbuckle and clips, shackle  
Install permanent water connection and move irrigation computer indoors Kit of fittings and adapters; design sheet  
Install WARC yagi on 54 foot tower    
Paint 80 foot tower with two-component paint Two painting gloves
Many rolls of Classic 33 electrical tape
Buy at the paint factory on the island
Repair tiles in bathroom Tube of glue; small tub of premixed grout mix  
Install coax switching system Daiwa switch console; station switch consoles; console mounting hardware, many coax jumpers, pre-made; Top Ten band decoder and switch box; labels; LPT cable; DB-25 cable to coax switch; one female Type N connector Hooks for cable to install in wall
Install new water heater Kit of fittings and design drawing  
Install triple truss system on 20 yagi Truss kit with all parts pre-made  
Install WARC connector on coax bulkhead Heliax connector, terminates in male Type N  
Assemble large 15 meter yagi Design specs; truss kit with all parts pre-made  
Install 6 meter yagi    
Repair broken sliding glass door screen   Screen material and tool are on hand
Install bottom 10 yagi at 30 feet   Beam and hardware and pigtail are on hand
Install labels on stack boxes Preprinted labels  
Install new garbage disposal and sink basket   Buy on island
Install stub kits on Station 1 6 coax tee connectors RCS-8V and stub kit on hand
Install stub kits on Station 2 6 coax tee connectors RCS-8V and stub kit on hand (G3XSV)
Set up Stations 2 and 3 for W3NQN selection    
Install beverage for US/JA on ridge 470 ohm resistor, 2 ground rods Transformer and wire and posts on hand.
Install beverage for Eur on ridge Need transformer # 2; 470 ohm resistor, 2 ground rods  
Install one run of Heliax to beverage takeoff point on ridge Barrel connectors and adapters for Heliax terminations (per NW0L)  
Install permanent run of phone line to east bedroom More surface-mount moulding  
Install permanent directions placard on security system panel Custom placard  
Install telephone line into East bedroom Wiremold and splice sets  
     

 

February 12 - 20 2001

Project Need to Take On Hand or Buy Locally
Install Wiring Duct for 220 V Feed and Telephone many wiremold pieces and parts
many screw anchors
small flat washers
 
Install More Heliax Hangers Under Porch 5 more rope hangers
large masonry anchors
 
Install Cover Plates on All 13 receptacles in Wiring Duct five 220 volt covers
seven double receptacle covers
one telephone cover
 
Install New Faucet Sets in Both Bathroom Sinks Moen single handle faucets
Four flexible fill tubes
 
Install Curtains and Rods at all Windows and Doors Cindy is gathering materials rapidly  
Install Decorative Valences to Match Couch Cushions material
Cindy and her Mom will fabricate and pack installation kit
 
Install Permanent Phillystran Guys on Mult Tower three lengths of Phillystran
six Phillystran deadends
six steel guy deadends
three 403 large porcelain insulators
three turnbuckles
45 feet of steel guy cable
Install Cable Hangers on Operating Tables six cable hangers
large sheet metal screws
 
Replace Light Switches and Cover Plates with Decora six single gang switches
two three way switches
eight Decora switch cover plates
 
Relocate Fan Switches and Install Wiremold   wiremold
Install New Rotor in Mult Tower new rotor at Goose's  
Paint and Finish Entire East Bedroom   all paint and supplies are on hand
Scrape and Paint Porch Corner Posts   all paint and supplies are on hand
Reinstall Ocean Ground stainless steel wire rope
bonding hardware
 
Dress Cables for 30 Meter Vee and Rotor Onto Messenger Cable   cable, tiewraps
Fabricate and Install 30 Meter Inverted Vee on Mult Tower KP2F 40 meter vee  
Install Both Coax Entry Bulkheads both Al panels, prepunched and drilled
three more Romex bushings and fiber washers
coax bulkhead connectors
masonry anchors (8)
standoff bushings (8)
Make Interface Cable and Put the 2 Meter Station on the Air Astron DC supply connectors are on hand
Reinstall New Hard Drive in DMI Computer replacement hard drive  
Hang Art on Walls Cindy's framed materials  
Install a Permanent Coax Line to the US Beverage Termination Point   coax
connectors
Bev matching box
Assemble the N8LGP 10 Meter 5 El Yagi   antenna is on hand
Fabricate Stubs for Stub Sub-assembly Ameritron RCS-8V switching box coax and connectors on hand
dimensions available online
Install Missing Cabinet Screws in AL-1200 20 miniature sheet metal screws  
Install Cabinet Handles in Kitchen 20 handles and screws on 3.5 inch centers  

 

December 31 2000 - January 22 2001

Project Need to Take On Hand or Buy Locally
Install Overhead Messenger Cable for Coax 60 feet 1/4" EHS guy wire
two 1/4 " deadends
two large thimbles
shackle to fit through block wall
3/4 inch foot long masonry bit
many black tie wraps
Install Permanent Heliax Run to Mult Tower 155 ft length of heliax
female Type N
bulkhead panel assembly

hangers for Heliax under the eaves
tape and tie wraps
Install Coax Bulkhead Panels two 10.5 inch Al relay rack panels
nine 1 " conduit connectors
many UHF bulkhead connectors (have four now)
two each ground wire lugs
masonry anchors, long bolts, and eight standoff spacers
3/4 inch foot long masonry bit
 
Install AC Service Ducting in Main Room many Hubbel "Basetrak" components
7 110 VAC ivory receptacles
5 220 VAC ivory receptacles

printed labels and tape
Cu wire
wire nuts
Install Water Filter in Utility Room water filter
spare filters
assorted 3/4" and 1/2" Cu fittings and compression sleeves
US 1/2" Cu tubing
asst'd US 1/2" Cu fittings
 
Beef Up Tower Base four pieces 2 ft rebar
3/4 inch foot long masonry bit
bags of concrete mix
Install AC Grounding pipe clamp to get on water pipe - 1 1/4"
heavy Cu wire
split bolts
90 ft 1 1/2" Cu strap for ocean ground
ground rods and clamps
Cu 1/4" strap
Label KU8E RX Box printed labels and tape
rubber feet
 
Assess Tower Hole Construction    
Rebuild Toilet in East Bedroom repair kit
tank gasket
new toilet seat
Ring Out and Label all Electrical Ccts and Fuses   labelmaker and tape
Install Gas Range   range, supply tank, spare tank, tubing
Install Outdoor Shower shower valve, head, Cu fittings  
Extend Telephone Line to Radio and East Bedroom telephones wire on hand
tee connector on hand
Install Wiremold Kits on Ceiling Fans 40 feet small gauge wiremold  
Construct Secure Hidden Storage Vault circular saw lumber and screws/anchors
Install New Garbage Disposal   all components at Marachena Hardware
Rehabilitate all Security Bars    
Replace Bad Ceiling Panels in East Soffit    
Rebuild Sliding Glass Door Rollers    
Install Light-Actuated Utility Room Light photocell adapter  
Install Motion Sensor on Spotlights motion sensor adapter  
Redecorate Sofa and Love Seat 10 new seat covers
paint wood frames
 
Install Drip Irrigation System for Trinitaria   system available near Jossy's on island
Install T-2X in Mutiplier Tower rebuilt T-2X from N6HR  
Repair Destroyed Power Supply in TS-930 replacement parts for entire power supply