W0CG (top) and N8NR getting ready to raise another section on the 55G tower. We built this entire 100 foot Rohn 55 tower in a day on Monday, 2 July 2001. |
Getting prepared to set the top section. |
N8BJQ's moonshot. Here is the Signal Point tower farm, complete on the evening of 2 July 2001. The original PJ9JT tower and tribander, center, is dwarfed by the new stuff. |
The farm as viewed looking east, with the delapidated Sunset Waters maintenance building in the foreground. |
The 40 yagi in its pre-launch position. |
We took W6QHS's advice to heart and beefed up this yagi to the letter of his book, including dumping the Cush Craft boom-to-mast mount in favor of a Hy-Gain mount and MUCH bigger hardware. |
The two 205CAS yagis awaiting their turn on the tram line, with the 38 foot boom 15 yagi in the background. |
We doubled the plate for the 40 driven element and stuffed the boom with dowel rod, then pinned the whole thing with a 1/4 inch stainless bolt. |
Leaving nothing to chance, the feedpoint for the 40 is doubled, using both the through-boom bolts and the blue pigtails attached to pipe straps on the driven element. |
W0CG and N8NR persuading the 40 yagi into position at 105 feet. |