The 40 yagi in place atop the 100 foot Rohn 55 tower. This was 3 July 2001 -- what a great sight after nearly a year of preparation and work! |
The old PJ9 tower looks sad by comparison. |
This is the Europe 105 CAS in the on-deck position prior to being tested and then installed. |
The boom trusses were crude, but basic and effective. |
Looking toward Africa from the top of the 100 foot Rohn 55 tower. It is dusk when this was taken. . |
W0CG took this one looking down on the top of the PJ9JT Mosley CL-33 tribander. Nice shot of our growing pile of trash, also, as we consumed the shipment and discarded the boxes. |
Sunset from the top of the tower, with the 40 yagi reflector in view. Ham Heaven?? |
On July 4 Bob and Geoff are wrestling the Europe 105 CAS into place as a side-mounted antenna. |
At dusk on the next day, July 5, we are fixing the Europe 15 monobander in place. This antenna was designed by W8AV and built with a 38 foot boom by N8LGP. |
We worked at dark because the winds "dropped" to only about 20 knots then. |