Interim Rohn Cost Estimate (January 2001)
100 foot tower |
3 Rohn 45G tower sections (the other 7 sections are being donated by N8NR!) Click here for photo from N8NR's pole building. |
$179 (Texas Towers) | $537 |
100 foot tower | 45G flat top | $0 (donated by N8NR) | $0 |
100 foot tower | AS455G rotor shelf Click here for photo. | $0 - (donated by N8NR) | $0
|
100 foot tower | 3 GA45G guy bracket assemblies | $0 (donated by N8NR) | $0 |
100 foot tower | BPC45G flat concrete base plate | $0 (donated by N8NR) | $0 |
100 foot tower | 2 inch thrust bearing and galvanized bolts | W8AV will procure | $0 |
100 foot tower | Phillystran guy wire and 18 deadends | Already have | $0 |
100 foot tower | 9 403 insulators to transition from Phillystran to steel guys, about 15 feet off the ground | W8AV and W0CG will supply | $0 |
100 foot tower | 108 feet 1/4 inch EHS guy wire | N8NR will supply | $0 |
100 foot tower | 9 1/2 inch x 12 inch turnbuckles | $17 (Texas Towers) | $153 |
100 foot tower | EP25343 three-hole galvanized equalizer plates plus galvanized hardware | W0CG will supply | $0 |
100 foot tower | GAR30 3 concrete guy anchor rods | $35 (Texas Towers) | $105 |
100 foot tower | Excavation of four base holes | Estimated $100 each | $400 |
100 foot tower | 3 cubic meters concrete | $95 each (estimated) | $285 |
TOTAL | $1480 | ||
80 foot tower | Tower sections | W8AV will supply | $0 |
80 foot tower | 2 inch thrust bearing and galvanized bolts | W8AV will supply | $0 |
80 foot tower | Phillystran guy wire and 18 deadends | Already have | $0 |
80 foot tower | 6 403 insulators to transition from Phillystran to steel guys, about 15 feet off the ground | W8AV and W0CG will supply | $0 |
80 foot tower | 108 feet 1/4 inch EHS guy wire | N8NR will supply | $0 |
80 foot tower | 6 1/2 inch x 12 inch turnbuckles | $17 (Texas Towers) | $153 |
80 foot tower | EP25343 three-hole galvanized equalizer plates plus galvanized hardware | $22 | $66 |
80 foot tower | GAR30 3 concrete guy anchor rods | $35 (Texas Towers) | $105 |
80 foot tower | Excavation of four base holes | Estimated $100 each | $400 |
80 foot tower | 3 cubic meters concrete | $95 each (estimated) | $285 |
GRAND TOTAL | $2489 |